Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting
A technology of pre-split blasting and roof cutting pressure relief, which is applied in the field of blasting and pressure relief, can solve the problems of strong mine pressure and coal pillar stress concentration in gob-side roadways, so as to improve coal pillar stability and reduce roadway deformation and damage. , The effect of reducing the number of roadway renovations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] like Figure 1 ~ Figure 3 Shown, the present embodiment coal seam thickness M is 10m, specifically comprises the following steps:
[0030] Step 1: Arranging the top-cut roadway 2
[0031] The coal seam 7 is an extra-thick coal seam 7, so before the mining of the working face 6, the top-cut roadway 2 is excavated along the roof of the coal seam 7 in the coal pillar 3, and the horizontal stagger distance S between the top-cut roadway and the recovery roadway is 7m ;
[0032] Step 2: Arranging blast holes 4 and control holes 5
[0033] Inclined blastholes 4 and control holes 5 are vertically arranged in the roof rock layer 8 above the entire roof cutting roadway 2, and the control holes 5 are arranged in the middle position between adjacent blastholes 4; The distance between the side of the roadway 2 near the working face 6 is 1.5m, the bottom of the hole is set in the vertical plane of the side of the roadway 1 near the coal pillar 3 in the mining roadway 1, and the bl...
Embodiment 2
[0037] like Figure 4 ~ Figure 5 Shown, present embodiment coal seam thickness M is 5m, specifically comprises the following steps:
[0038] Step 1: Arranging the top-cut roadway 2
[0039] The coal seam 7 is a thick coal seam 7, and the mining roadway 1 is used as the top cutting roadway 2;
[0040] Step 2: Arranging blast holes 4 and control holes 5
[0041] In the coal seam 7 and the roof rock layer 8 above the entire roof cutting roadway 2, inclined blast holes 4 and control holes 5 are longitudinally arranged, and the control holes 5 are arranged in the middle position between adjacent blast holes 4; the blast holes 4 and the control holes 5 is 1.5m away from the roadway side of the top-cut roadway 2 near the coal pillar 3, the blast hole 4 and the control hole 5 are arranged in parallel in the same vertical plane, and the angle α between the blast hole (control hole) and the coal seam roof is 45° , the distance W between adjacent blasting holes is 10m, the vertical di...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com