Horizontal-drilling staged-fracturing pressure relief method for underground coal bed
A horizontal drilling and staged fracturing technology, which is applied in earthwork drilling, wellbore/well components, gas discharge, etc., can solve the problems of high gas outburst, rock burst, etc., and reduce the gas content and risk , Improve the effect of permeability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] According to the characteristics of the coal seam structure of the coal seam face, when the coal seam has good pore geological conditions and good permeability, follow the figure 1 For implementation, the specific method is to drill a main horizontal hole 5 with a length of 500m----1000m with a Φ215.9mm drill bit in the coal seam face 7 of the underground, and then run a steel-grade N80 oil casing pipe with a diameter of Φ139.7mm and a wall thickness of 7.72mm. 4. Cement the well with G-grade cement, wait for setting and then enter Φ118mm*2 after 48 hours 。 The single-bent screw is drilled into the main horizontal hole 5. 8-10 branch holes of 100-200m are drilled. After the drilling is thoroughly cleaned, the pressure-resistant 70MPa high pressure seal is installed at the main horizontal hole 5 through the high-pressure pipeline Hole device 3, and connect the pump injection equipment 2 with a working pressure of 70MPa, and pour 1500m into the hole 3 Or more volume of 0.5% ...
Embodiment 2
[0024] According to the characteristics of the coal seam structure of the coal seam face, in the case of poor pore-forming geological conditions and poor permeability, follow the figure 2 To implement, the specific method is to drill a main horizontal hole 5 with a length of 500m----1000m with a Φ215.9mm drill bit in the coal seam face 7 of the underground, and then run a steel-grade N80 oil casing pipe with a diameter of Φ139.7mm and a wall thickness of 7.72mm. 4. Cement the well with G-grade cement, wait for setting and then 48 hours later, run a Φ118mm screw, and then drill a 500-1000m horizontal borehole on the main horizontal hole 5. After thoroughly cleaning the borehole, enter the main horizontal hole 5. Install the pressure-resistant 70MPa high-pressure sealing device 3 through the high-pressure pipeline to connect the high-pressure pump injection equipment 2 with a working pressure of 70MPa, and then inject the polymer gel liquid with natural quartz sand proppant into ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com