Construction support system and construction method of large-section tunnel in weak geological environment
A technology for weak geology and tunnel construction, applied in the field of tunnels, can solve problems such as interference in sub-excavation procedures, and achieve the effect of good hole formation, simple structure and little mutual interference.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0016] refer to figure 1 , the construction support system for a large-section tunnel in weak geological environment according to the present invention includes: the initial support for the whole ring formed by stepwise excavation along with the upper left pilot tunnel I, the upper right pilot tunnel II, the lower left pilot tunnel III, and the lower right pilot tunnel IV. The initial support 21 of the upper left pilot tunnel, the initial support 22 of the upper right pilot tunnel, the initial support 23 of the lower left pilot tunnel and the initial support 24 of the lower right pilot tunnel of the protection structure, and the secondary lining structure of the upper left pilot tunnel Lining 11, secondary lining 12 of the upper right pilot tunnel, secondary lining 13 of the lower left pilot tunnel and secondary lining 14 of the lower right pilot tunnel...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com