Cultivation method for achieving large cherry high yield on low-latitude and high-altitude areas
A cultivation method and high-altitude technology, applied in the field of artificial cultivation of large cherries, can solve problems such as low fruit setting rate, delay germination period, and reduce ground temperature, so as to improve yield and fruit quality, increase fruit quality and yield, and avoid environmental pollution Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] Ridge is planted on the row that has big cherry tree, and the height of this ridge is 30cm, and width is 120cm; When in autumn, dig the ground ridge close to the tree root and apply organic fertilizer and bury it, then water, and use the same amount of ridge width again. Cover with matching horticultural ground cloth; add micro-spraying facilities on the upper part of the canopy, and start the micro-spraying facilities when the temperature is ≥ 22°C during the period from pre-flowering to young fruit stage in spring, and spray to cool down to 18°C. Among them, apply 6kg of organic fertilizer and pour 7kg of water to each tree whose age is 5 to 8 years; apply 9kg of organic fertilizer and pour 10kg of water to each tree whose age is more than 9 years. After testing, the fruit setting rate was 35%.
Embodiment 2
[0019] Ridge is planted on the row that has big cherry tree, and the height of this ridge is 35cm, and width is 130cm; When in autumn, dig the ground ridge near the tree root and apply organic fertilizer and bury it, water then, and use the same amount of ridge width again. Cover with matching horticultural ground cloth; add micro-spraying facilities on the upper part of the canopy. During the period from pre-flowering to young fruit stage in spring, when the temperature is ≥ 22°C, start the micro-spraying facilities and spray to cool down to 20°C. Among them, apply 5kg of organic fertilizer and pour 6kg of water to each tree whose age is 5 to 8 years; apply 10kg of organic fertilizer and pour 10kg of water to each tree whose age is more than 9 years. After testing, the fruit setting rate was 33%.
Embodiment 3
[0021] Ridge is planted on the row that has big cherry tree, and the height of this ridge is 35cm, and width is 150cm; When in autumn, dig the ground ridge near tree root and apply organic fertilizer and bury it, water then, and use the same amount of ridge width again. Cover with matching horticultural ground cloth; add micro-spraying facilities on the upper part of the canopy, and start the micro-spraying facilities when the temperature is ≥ 22°C during the period from pre-flowering to young fruit stage in spring, and spray to cool down to 17°C. Among them, apply 6kg of organic fertilizer and pour 5kg of water to each tree whose age is 5 to 8 years; apply 9kg of organic fertilizer and pour 8kg of water to each tree whose age is more than 9 years. After testing, the fruit setting rate was 36%.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com