Method for deep excavation pit combination support construction close to subway station
A construction method and technology for deep foundation pits, which are applied in basic structure engineering, excavation, construction, etc., can solve the problems of affecting the construction speed of underground structures, increasing construction costs, and applying support prestress control requirements are very high.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below in conjunction with specific examples.
[0028] one, Construction process
[0029] Such as figure 1 with figure 2 As shown, a kind of deep foundation pit combined support construction method close to the subway station of the present invention mainly comprises the following steps:
[0030] 1) On the outer side of the underground structure at the entrance and exit 1 of the subway station, that is, on the side opposite to the deep foundation pit, set up a double row of reinforced concrete pouring piles 2 to retain soil;
[0031] 2) Install a single row of reinforced concrete cast-in-situ piles 3 on the inner side of the underground structure at the entrance and exit of the subway station, that is, on the side adjacent to the deep foundation pit;
[0032] 3) Construction of the coupling beam at the top of the above-mentioned reinforced concrete pouring pile;
[0033] 4) When the connecting beam reaches the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com