Cast-in-place pile synchronous casing hole-forming constructing method

A construction method and technology of cast-in-situ piles, applied in the direction of drill pipe, casing, sheet pile wall, etc., can solve the problems of waste of concrete filling coefficient in loose gravel sand layer, increase of pore forming efficiency in hard rock layer, pollution of surrounding environment, etc. To achieve the effect of reliable construction quality, shortening the construction period and protecting the environment

Inactive Publication Date: 2013-04-03
SHANDONG WANXIN CONSTR
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

There are generally methods of drilling holes such as impact, long and short spirals, positive and negative circulation, rotary digging, and manual hole digging. None of the methods can effectively overcome the
In addition, the stability of the loose gravel sand layer is also solved by wasting concrete to increase the filling coefficient. The pore-forming efficiency of the hard rock layer also results in a significant increase in cost and a prolonged construction period. In addition, mud protection is required during the pore-forming process, which produces a large amount of mud and pollutes the surrounding area. surroundings

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The present invention will be further described below in conjunction with embodiment:

[0016] The construction method of the cast-in-place pile synchronously following the tube forming hole according to the present invention takes the following steps:

[0017] 1) Pile position setting out: according to the designed pile position map, number the piles one by one according to the construction sequence, use the total station to carry out pile position setting out according to the axis corresponding to the pile number, and drive the pile into the ground with a 0.5m steel head after placing the pile point Set up protection points 1 meter away from the pile point, the allowable error of stake out is <10mm, and check before piling.

[0018] 2) Synchronous follow-up steel casing installation: Install a corresponding length of synchronous follow-up steel casing at the lower end of the casing power head of the pile driver. Pipe power head, lift the synchronous follow-up steel c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of building engineering and particularly relates to a cast-in-place pile synchronous casing hole-forming constructing method. The method comprises the following steps of 1, pile position lofting; 2, synchronous follow-up installation; 3, pile machine positioning; and 4, hole forming and hole cleaning. The cast-in-place pile synchronous casing hole-forming constructing method has the beneficial effects that when the stratum has giant-grained soil layers such as erratic boulder, rock block and pebbles, the problems of verticality deflection and drill clamping through rock caving can be effectively solved, the construction speed is high, and the cost is low; for strata such as loose backfill soil and sand layers, the occurrence of pile body hole collapse phenomena can be effectively controlled, and the concrete cost is effectively reduced; the slurry making wall protection is not needed, a synchronous follow-up steel sleeve can effectively prevent the hole collapse, meanwhile, the synchronous follow-up steel sleeve can be embedded into the rock layer in time, an effect of preventing underground water from leaking into the pile holes is realized, and no water exists in the holes after the hole forming; and the method has the characteristics that the construction quality is reliable, the hole forming speed is high, the hole forming rate is high, the adaptability is high, and the like, the noise is low, the pollution is little, and the environment is protected.

Description

technical field [0001] The invention relates to a construction method for synchronously following pipes with cast-in-place piles, which belongs to the technical field of construction engineering, and is suitable for loose gravel sand layers, thick backfill soil layers, huge grain soil layers with boulders, boulders, pebbles, etc., hard The invention relates to the technical field of large-diameter rock-socketed cast-in-situ piles forming holes in strata such as hard rocks. Background technique [0002] At present, there are two types of hole-forming methods in the construction of cast-in-situ pile foundations in my country: sinking tube forming holes and drilling holes. Immersed tube hole forming is limited by immersed tube equipment and geological conditions, and the pile length and diameter cannot meet the large design bearing capacity requirements. There are generally methods of drilling holes such as impact, long and short spirals, positive and negative circulation, rot...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/38E21B4/14E21B17/22
Inventor 李永峰于克猛王晓张鑫宇
Owner SHANDONG WANXIN CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products