SCS concrete filled steel tube pier reinforced by stirrup and stiffening rib at end
A technology of steel tube concrete and stiffeners, which is applied to bridges, bridge parts, bridge materials, etc., can solve the problems of easy bending at the upper and lower ends, small hoop effect, poor connection performance, etc., and achieve good torsional performance and construction The effect of low cost and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as figure 1 , figure 2 and image 3 As shown, the present invention includes an outer steel pipe 1, an inner steel pipe 2 sleeved inside the outer steel pipe 1, a top stiffening structure arranged between the top end of the outer steel pipe 1 and the top end of the inner steel pipe 2, and a top stiffening structure arranged between the bottom end of the outer steel pipe 1 and the inner steel pipe 2. The bottom stiffening structure between the bottom ends and the concrete structure 4 formed by pouring concrete in the cavity between the outer steel pipe 1 and the inner steel pipe 2 after the top stiffening structure and the bottom stiffening structure are laid out , the inner steel pipe 2 is a circular steel pipe and it is arranged in the inner middle part of the outer steel pipe 1 . The outer steel pipe 1 and the inner steel pipe 2 are arranged coaxially. The top stiffening structure includes multiple PBL stiffening ribs 1 3-1, and the bottom stiffening structur...
Embodiment 2
[0063] Such as Figure 4As shown, in this embodiment, the difference from Embodiment 1 is that the cross section of the outer steel pipe 1 is circular, A1:A2=1:0.6, and the wall thicknesses of the outer steel pipe 1 and the inner steel pipe 2 are both 25mm, A1=π·R 2 =10m 2 , where R is the outer diameter of the outer steel pipe 1.
[0064] In this embodiment, the structures and connections of other parts are the same as those in Embodiment 1.
Embodiment 3
[0066] Such as Figure 5 As shown, in this embodiment, the difference from Embodiment 2 is that the number of the first PBL stiffener 3-1 and the second PBL stiffener 3-2 is 6.
[0067] In this embodiment, the structures and connections of other parts are the same as those in Embodiment 2.
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
length | aaaaa | aaaaa |
length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com