Karst roadbed grouting process
A process and roadbed technology, applied in the field of grouting technology of karst roadbed, can solve the problems of difficult control of grouting amount, long initial setting and final setting time, etc., to ensure the grouting effect, shorten the initial setting and final setting time, and ensure rigidity and stability. the effect of strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0033] figure 1 Shown is the flow chart of the karst subgrade grouting process in the embodiment of the present invention. Such as figure 1 As shown, the karst subgrade grouting process in the embodiment of the present invention comprises:
[0034] S1. Evenly distribute the grouting holes on the karst roadbed working face, and use a certain number of grouting holes as pilot holes.
[0035] In engineering construction, karst subgrades generally include embankments and road cuttings, such as figure 2 As shown, in order to realize the uniform distribution of grouting holes 2 (indicated by ○ in the figure), the grouting holes 2 in the embankment section S are arranged in ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com