Construction method for cantilever assembly steel arches for cast-in-situ large-span concrete arch bridge
A construction method and technology of steel arch frame, applied in the field of cantilevered steel arch frame of arch bridge, can solve the problems of cumbersomeness, influence on construction, rigidity, etc., and achieve the effect of advanced technology, firm fixation and reasonable structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The construction method of the cantilevered steel arch frame of the cast-in-place long-span concrete arch bridge. The steel arch frame is composed of the standard segment 2, the adjustment segment 4, the vault segment 3 and the arch foot segment 1. Arch assembly and steel arch lateral movement are carried out simultaneously on both sides of the bridge span during construction. The characteristics are: the transverse connection method is adopted for the transverse connection during the segmental connection process, and the horizontal connection method is used for the top surface of the arch frame and the ground; The connection between the segments is connected by the lower chord pin and the upper chord bolt; the specific construction is carried out according to the following steps:
[0040] Step 1, set the steel arch abutment; the steel arch abutment is a temporary abutment used to support the cast-in-place construction load. At the same time as the steel arch seat, the ...
Embodiment 2
[0050] Taking the Fuxi River Bridge as an example, the Fuxi River Bridge is located on the eastern edge of the Guizhou Plateau. The bridge area is a plateau structure erosion-denudation low-middle mountain valley landform. The altitude near the bridge area is between 324.5 and 364m, with a relative height difference of 39m. The covering layer of the bridge area is cultivated soil, silty clay and alluvial-diluvial pebble soil. The upper structure of Fuxi River Bridge adopts 5×20m (prestressed concrete hollow slab) + 120m (reinforced concrete box arch) +2 ×20m (prestressed concrete hollow slab). The main hole of the lower structure adopts cast-in-place reinforced concrete abutment and cast-in-place concrete foundation, and reinforced concrete bent piers are set on the arch, and the junction piers No. The pile foundation and abutment foundation are cut and expanded foundations, and the abutments on both banks are gravity U-shaped abutments.
[0051]The steel arch is composed of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com