Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Summarized information monitoring system of tunnel

A comprehensive information and monitoring system technology, applied in the direction of electrical program control, comprehensive factory control, etc., can solve the problems of not being able to reflect the deformation of engineering structures in time, dark tunnels, construction impacts, etc., and achieve low-light effects, large photosensitive areas, The effect of accurate collection

Active Publication Date: 2012-07-25
北京市政路桥锐诚科技有限公司
View PDF3 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] 1. There are many human-influenced factors and construction-influenced factors in the data collection process, the authenticity of the data cannot be guaranteed, and the deformation of the surrounding rock cannot be accurately reflected
[0006] 2. The automation and informatization of monitoring and measuring equipment are low, and the workload of data post-processing is large, which takes up a lot of manpower and material resources, and cannot reflect the deformation of engineering structures in time
[0007] 3. The data acquisition is slow, and the tunnel is relatively dark. If the measurement point is not accurately located, measurement deviation is prone to occur
[0008] 4. Data transmission, storage, and information management cannot meet the requirements of information construction management, and cannot guide engineering information design and construction in a timely manner
[0009] 5. Unable to conduct video surveillance on the tunnel and grasp the picture information
[0010] 6. It is necessary for surveyors to enter the tunnel to work, which is easy to affect the construction and has potential safety hazards
[0011] 7. The data obtained by monitoring and measurement cannot be quickly analyzed on the computer, and the early warning and forecast

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Summarized information monitoring system of tunnel
  • Summarized information monitoring system of tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] For the structural diagram of the tunnel comprehensive information monitoring system of the present invention, see figure 1 , the tunnel comprehensive information monitoring system is mainly composed of frequency automatic monitor 5, blasting vibration automatic monitor 6, video acquisition automatic monitor 7, three-dimensional section automatic monitor 8, wireless routing repeater 4, wireless high-speed relay station 3, network The switch 2 and the monitoring host 1 are composed; the monitoring host 1 is sequentially connected with the network switch 2, the wireless high-speed relay station 3, and the wireless routing repeater 4; the wireless routing repeater 4 is respectively connected to the automatic frequency monitor 5, Blasting vibration automatic monitoring instrument 6, video acquisition automatic monitoring instrument 7, three-dimensional section automatic monitoring instrument 8; the frequency automatic monitoring instrument is connected with a vibrating wire ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a summarized information monitoring system of a tunnel. The summarized information monitoring system mainly comprises an automatic frequency monitor, an automatic blast vibration monitor, an automatic video acquiring monitor, an automatic three-dimensional section monitor, a wireless route repeater, a wireless high-speed repeater station, a network exchanger and a monitoring host. The monitoring host is connected with the network exchanger, the wireless high-speed repeater station and the wireless route repeater sequentially; the wireless route repeater is connected with the automatic frequency monitor, the automatic blast vibration monitor, the automatic video acquiring monitor and the automatic three-dimensional section monitor respectively; the automatic frequency monitor is connected with a vibration-wire sensor; and the automatic blast vibration monitor is connected with a three-direction or one-direction speedometer. The summarized information monitoring system disclosed by the invention can implement monitoring, pre-alarming and forecasting on surrounding rock pressure, rock mass vibration and clearance variation.

Description

technical field [0001] The invention relates to a tunnel comprehensive information monitoring system, which is suitable for tunnel construction monitoring measurement and early warning and forecasting, and belongs to the field of tunnel monitoring. Background technique [0002] my country is a mountainous country, and tunnels account for a large proportion of the construction of railways and highways in mountainous areas of our country. At present, more and more new Austrian methods are used in tunnel engineering in my country. The main feature of building tunnels with new Austrian methods is to monitor the dynamics of the tunnel surrounding rock after excavation through many measurement methods, and use them to guide tunnel support. Design and construction of protective structures. As an important part of NATM tunnel construction, the accuracy and timeliness of tunnel monitoring and measurement work is directly related to the safety and progress of tunnel construction. How...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G05B19/418
Inventor 高文学孙西濛邓洪亮石效民李杨周世生李志星叶春琳张宇华吕嘉叶锦华孙景凤
Owner 北京市政路桥锐诚科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products