Embodiment 1
[0024] figure 1 It is a flow chart of the early warning method provided by Embodiment 1 of the present invention. The method can be realized by an early warning system implemented by software and / or hardware, and specifically includes the following steps:
[0025] Step 110, collecting the current monitoring value;
[0026] In the above step 110, the current monitoring value is the dynamic data of the monitoring point monitored by various sensors during the production operation process, which can reflect the environmental condition of the monitoring point. For example, in the mine safety monitoring system, real-time monitoring data such as gas concentration monitoring value, carbon monoxide concentration monitoring value, wind speed monitoring value, temperature monitoring value, voltage monitoring value or current monitoring value of each mining head of the mine are monitored. The monitoring value of each monitoring point can be collected according to the set period.
[0027...
Embodiment 2
[0034] The early warning method provided in Embodiment 2 of the present invention may be based on the early warning method of the above embodiment, specifically adopting the following early warning strategy as a scheme for judging whether to give early warning. The early-warning strategy is specifically the early-warning method of comparing the increment of the inspection cycle before and after. The so-called inspection cycle is: the length of time between two collection times, and the monitoring value is collected once in each inspection cycle. The inspection cycle setting can be the same as the cycle of each working face in the specific production operation.
[0035] Among them, the change value is generated according to the comparison between the current monitoring value and the recorded historical monitoring value, specifically: calculating the difference between the current monitoring value and the last collection time, that is, the monitoring value of the previous inspect...
Embodiment 3
[0046] The early warning method provided by the third embodiment of the present invention can be based on the early warning method of the above-mentioned embodiment, and specifically adopts the following early warning strategy of comparing average value increments as a scheme for judging whether to warn or not.
[0047] The step of generating a change value based on the comparison between the current monitoring value and the recorded historical monitoring value specifically includes:
[0048] Calculate the average value of the monitoring values at each collection time of the previously set number;
[0049] The difference between the currently monitored value and this average value is calculated as the change value.
[0050] Taking the monitoring value of the gas concentration monitoring value as an example for illustration, the change value is compared with the preset threshold value according to the early warning strategy to generate early warning signals including:
[0051]...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com