Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Workshop production plan and scheduling integrated method under cross-workshop cooperation mode

A technology of production planning and collaboration mode, applied in computing, manufacturing computing systems, instruments, etc., and can solve complex problems

Inactive Publication Date: 2012-07-11
BEIJING INSTITUTE OF TECHNOLOGYGY
View PDF0 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0015] As mentioned earlier, the purpose of the present invention is to solve a complex problem model

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Workshop production plan and scheduling integrated method under cross-workshop cooperation mode
  • Workshop production plan and scheduling integrated method under cross-workshop cooperation mode
  • Workshop production plan and scheduling integrated method under cross-workshop cooperation mode

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0088] The preferred embodiments of the present invention will be specifically described below in conjunction with the accompanying drawings.

[0089] This embodiment specifically implements the solution for the integration of production planning and scheduling described in the summary of the invention, and performs test simulation verification on the optimization results.

[0090] The flexible manufacturing system used for simulation in this embodiment is set up as follows, with a total of 800 machines distributed in 12 different workshops. These 12 workshops include 3 types of workshops including heat treatment workshop, assembly workshop and machining workshop. The same machine may also be distributed in different workshops. Almost all part routings have shop floor reentrancy issues. The experimental data adopts the data of the actual model A, which contains 2641 parts and 21306 processes.

[0091] Since the maximum production quantity per production month in actual prod...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a workshop production plan and scheduling integrated method under a cross-workshop cooperation mode, which comprises the following steps of: firstly determining a narrowing workshop and a narrowing procedure; secondly, iterating, in each iteration process, pre-scheduling by adopting a dispatching rule-based scheduling method; and finally, regulating a production quantity according to a pre-scheduling result until outputting a scheduling result a corresponding production plan when the iteration is ended. According to the invention, the problem of unbalance of capability of production workshops can be effectively solved, the problem of transfer of a production task crossing the workshops is effectively solved, the production plan and the scheduling are integrated, and a production plane is given while a scheduling result is obtained.

Description

technical field [0001] The invention relates to a production planning and scheduling method of a manufacturing system, in particular to an integrated production planning and scheduling method for cross-workshop production tasks and the mixed problems of machining, assembly and heat treatment, belonging to the field of advanced manufacturing production control and scheduling optimization . Background technique [0002] In my country, most machinery manufacturing enterprises have established modern production lines, but at the same time, a large number of traditional equipment coexist with advanced equipment such as machining centers and CNC machine tools. Especially in large and medium-sized machinery manufacturing enterprises, the situation of multi-variety mixed production is very common. and will exist for a long time. In this context, the modeling and optimization methods of complex production process planning and scheduling problems face new challenges. The production p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/04
CPCY02P90/30
Inventor 李冬妮梁啟锵王彤王小海金铮郑伟居玉辉郝勇谢洪涛李弘赵凯潘树民许清波段勇郑鸿马小丽闫锦锋马开赵瑞颖邓卫云
Owner BEIJING INSTITUTE OF TECHNOLOGYGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products