Train control system simulation test system

A technology of train control system and simulation test, which is applied in the direction of electrical test/monitoring, etc., can solve the problems of increasing cost and increasing workload, and achieve the effects of simple and convenient operation, improving test efficiency and saving manpower

Active Publication Date: 2011-12-14
BEIJING HOLLYSYS
View PDF2 Cites 53 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This not only increases the cost of development, but also increases the workload for testers to relearn the new simulation system environment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Train control system simulation test system
  • Train control system simulation test system
  • Train control system simulation test system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] The technical solutions in the embodiments of the present invention will be described below with reference to the drawings in the embodiments of the present invention.

[0015] figure 1 A train control system simulation test system 100 according to an embodiment of the present invention is shown. Such as figure 1 As shown, the train control system simulation test system 100 includes a ground comprehensive simulation system 10, a CTC interface simulation system 20, a temporary speed limit server (TSRS) interface simulation system 60, a vehicle simulation system 30, train control vehicle equipment (not shown) , and the first RBC device 41, the second RBC device 42 and the railway dedicated wireless communication network (GSM-R network) 50. Such as figure 1 As shown, the train control system simulation test system 100 may also include an interlock interface simulation system 70 .

[0016] In one embodiment of the present invention, the ground comprehensive simulation s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a simulation test system of train control system. A ground integrated simulation system can receive train operation-related information from a train-carried simulation system, and receive train information corresponding to the train ID from a CTC interface simulation system. The CTC interface simulation system carries out data communication with a wireless blocking center device, the ground integrated simulation system, and the train-carried simulation system. A TSRS interface simulation system carries out data communication with the train-carried simulation system andthe wireless blocking center device. The train-carried simulation system is used for simulating speed signals, braking signals, a handle position, and responder signals of a train-carried system, andrecording communication status of the train in real time. The train-carried control device is used for receiving ground information, generating speed mode curves and monitoring the running of the train, and the wireless blocking center device is used for managing and controlling the running of the train.

Description

technical field [0001] The invention relates to a test system, in particular to a simulation test system for a train control system. Background technique [0002] With the speed increase and the construction of passenger dedicated lines, a high-performance train operation control system is required to provide guarantee for the safe operation of high-speed trains. At present, the CTCS-3 train control system has been widely used. The CTCS-3 train operation control system is an important technical equipment for the 300-350km / h passenger dedicated line of China's railways, and it is one of the core technologies to ensure the safe and reliable operation of high-speed trains. However, most of the existing CTCS-3 simulation testing technologies revolve around specific line data for simulation, so it is difficult to achieve flexible configuration. As a result, every time a line is opened, a simulation system needs to be developed. This not only increases the cost of development, b...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B23/02
Inventor 于磊赵利斌刘基全祁鹏方岳
Owner BEIJING HOLLYSYS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products