Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Integrated reinforcement bar pre-binding forming die constructing method for bridge construction

A bridge construction and construction method technology, applied in the direction of manufacturing tools, ceramic molding machines, etc., can solve the problems of difficult to readjust misplaced steel bars, low work efficiency, labor and time-consuming, etc., to achieve improved work efficiency, high work work efficiency, positioning accurate effect

Active Publication Date: 2011-11-02
CHINA RAILWAY 24TH BUREAU GRP +1
View PDF3 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, beam-making yards use pre-bundled split steel bars in the binding of steel bars. When the bridge deck pre-tied steel bar cages are hoisted on the bridge body steel bar cages, it is often encountered that the horizontal bar and the vertical wall bar of the web conflict with each other. phenomenon, and it is labor-intensive and time-consuming to adjust, and it is difficult to adjust the misplaced steel bar again;
[0004] Even though some beam-making yards adopt the one-time forming method of integral steel pre-binding, scaffolding is basically used to build fake inner molds when binding bridge deck steel bars on pre-tying tire molds, but the process of dismantling and installing scaffolding is long and the work efficiency is low.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated reinforcement bar pre-binding forming die constructing method for bridge construction
  • Integrated reinforcement bar pre-binding forming die constructing method for bridge construction
  • Integrated reinforcement bar pre-binding forming die constructing method for bridge construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The features of the present invention and other related features will be further described in detail below in conjunction with the accompanying drawings through embodiments, so as to facilitate the understanding of those skilled in the art:

[0029] like Figure 1 to Figure 4 As shown, the general reference signs respectively represent: floor reinforcement cage 1, web reinforcement cage 2, bridge deck reinforcement cage 3, tying mold 4, false intima 5, telescopic support rod 6, weep hole model 7, anti-rail wheel 8. Support plate model 9.

[0030] The design purpose of the present invention is to provide an integral steel bar pre-binding method that facilitates the disassembly and assembly of the inner mold model based on the shortcomings of the existing pre-binding forming methods of steel bars. The general design concept is as follows:

[0031] First, bind the bottom plate reinforcement cage 1 and the web reinforcement cage 2 on a binding mold 4 for controlling the p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a box beam forming method, in particular to an integrated reinforcement bar pre-binding forming die constructing method for bridge construction. The method is used for carrying out reinforcement bar binding of a box beam outside a beam fabricating station position and is characterized by comprising the following steps of: binding a bottom plate and web reinforcement bars on a binding clamping fixture; longitudinally and sequentially paving a reversal rail wheel and a support frame thereof at the upper edge of the binding clamping fixture; sliding and positioning an artificial inner film into the binding clamping fixture by a wheel shaft; regulating the height of the artificial inner film so that a bridge deck reinforcement cage can be bound on the artificial inner film; and contracting the artificial inner film so that the artificial inner film slides out of the binding clamping fixture. The integrated reinforcement bar pre-binding forming die constructing method for the bridge construction has the advantages that grooving spacer bars are adopted on the pre-binding forming die, fed in one step and accurately positioned, therefore no repeated technical labor of detecting the number of the reinforcement bars and the distance among the reinforcement bars is need in future; the operating work efficiency is high; the production line operation is adopted; and the time spent on the beam fabricating station position is not occupied.

Description

Technical field [0001] The invention relates to a box girder forming method, and in particular to an integral steel bar pre-tied tire formwork construction method for bridge construction. Background technique [0002] In order to improve the binding speed and quality of box girder steel bars, it is undoubtedly the best way to position the steel bars by tying box girder steel bars with tire molds. At the same time, it does not take up time on the beam making station. The assembly line operation can be carried out simultaneously with the beam making. No time is spent tying steel bars on the beam-making platform. [0003] At present, the beam-making yard uses split steel bars for binding. When the pre-tied steel cages on the bridge deck are hung on the bridge body steel cages, the horizontal steel bars and the vertical wall bars of the web often conflict with each other. phenomenon, and the adjustment is labor-consuming and time-consuming, and it is also difficult to adjust th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B28B23/14
Inventor 钱明剑徐建宏吴承张
Owner CHINA RAILWAY 24TH BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products