Method for constructing artificially natural slope-type terrace land in Three Gorges reservoir area
A technology of the Three Gorges reservoir area and construction method, which is applied in excavation, construction, infrastructure engineering, etc., can solve the problems of large amount of earthwork, low degree of mechanization, fragmented land, etc., and achieves increased soil layer thickness, low cost, and method simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Example 1: Building a ridge on a ridge
[0035] The main function of the ridge is to intercept the runoff generated by the slope precipitation and the sediment carried by the runoff. They are generally relatively low, mostly made by manual tamping and beating. Specific construction method: According to the critical slope length of rill erosion, the ridge spacing L is drawn up, and the ridge spacing L is generally greater than the critical slope length L of rill erosion R, so that rill erosion can occur on the slope between the ridges. In this way, under the action of trace erosion and down-slope erosion of the slope stream, the soil on the upper slope is gradually transported downward. For sand storage, the silt deposits on the part above the ridge, gradually raising the slope, thereby slowing down the slope. Farmers only need to heighten and reinforce the ridge every year or every few years. In this example, taking the 15° sloping farmland in the purple soil area as ...
Embodiment 2
[0036] Embodiment 2: simple civil engineering ridge building
[0037] Along the contour line, in accordance with the principle of taking advantage of large bends and straightening small bends, simple civil engineering is constructed on the slope at a certain distance, the distance is slightly greater than the critical slope length of rill erosion, and then log fences, bamboo rafts, biological frames, Build ridges with civil materials such as fly ash strip columns, concrete hollow cells, and block stones. In this embodiment, the 15° sloping farmland in the purple soil area is taken as an example, the interval distance is set to 6m, and the civil engineering materials are block stones. Firstly, lay out the line at the same height on the slope, clear the foundation of the field sill, and excavate to form a foundation trench with a height of 35cm and a width of about 25cm. Year after year, the slope of the field surface gradually slows down after plowing down the soil or the hydr...
Embodiment 3
[0038] Example 3: Building a ridge with hedgerows
[0039] Plant hedges are to plant perennial shrubs or herbaceous plants densely in lines or strips at certain intervals along the contour line on the slope or on the initial ridge that has been naturally formed on the sloping farmland to form an energy barrier. Water, retaining fence walls, and eroded sediment that reaches its upslope location produce siltation. With the enhancement of the sand-retaining effect of the hedgerow, the soil is continuously blocked near the hedgerow, and the slope gradually slows down, and the slope gradually develops from the steep slope to the gentle slope, and the slope cultivated land finally becomes a gentle slope terrace or a horizontal terrace. The selection of hedgerow varieties is mainly based on native varieties, supplemented by introduction, mainly by economic plant varieties, supplemented by pure ecological benefit varieties. In this embodiment, different hedgerow varieties are configu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com