Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction

A construction method and the technology of basket girders, which are applied in the field of bridge construction, can solve problems such as difficult observation, inaccurate control of preloading data, and large consumption of machinery and manpower, so as to facilitate construction control and adjustment, speed up preloading work efficiency, The effect of saving preloading construction time

Active Publication Date: 2012-08-08
THE 4TH CONSTR ENG CO LTD OF CHINA RAILWAY NO 4 ENG GRP
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the commonly used preloading method is to hoist the processed hanging basket to the top of the 0# section of the box girder on the bridge deck after the trial assembly in the processing yard, and carry out preloading on the top of the beam. Generally, sand bags or piles are used. Water storage, adopting this kind of preloading method, has the following disadvantages, which will affect the construction: 1. The workload on the bridge is heavy
Since the preload is equal load or overload preload, generally the preload load of each set of hanging baskets is more than 200t, and 200t of sandbags need to be hoisted, loaded and unloaded, and the labor intensity is high, and strict control is required, which consumes a lot of machinery and manpower.
And a hanging basket is composed of two triangular hanging basket trusses. When preloading, it is necessary to control the unbalanced weight on both sides to not exceed 5t, which is difficult to control
2. Prolong the construction period
Affect the duration of 15 days, or even longer
3. Inaccurate control of preloading data
No matter whether sand bag or water storage preload is used, the weight of the loaded load cannot be accurately controlled. Although it can eliminate the inelastic deformation, the elastic deformation value cannot be accurately measured.
4. It is difficult to observe the deformation and nodes everywhere
After the hanging basket is installed on the bridge, during the preloading process, both the deformation observation of the hanging basket and the deformation observation of the nodes need to be inspected by climbing, which is difficult and unsafe to observe
5. Traditional preloading is for high-altitude operations, and there are greater risks in safety
In case the design, processing or material quality of hanging basket trusses are unqualified, or the stacking exceeds the design value, it may cause the hanging basket system to overturn and lead to major safety and quality accidents

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction
  • Jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction
  • Jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0034] see figure 1 , the jack symmetric preloading construction method of hanging basket girders used in bridge hanging basket hanging construction, the preloaded triangular hanging basket girders include four main pieces: web bar 3, cross bar 1, short oblique bar 2, and long oblique bar 4 There are two bolt holes arranged side by side at the rear anchor point of the hanging basket truss; two bolt holes are arranged side by side at the loading end, and the diameter of the bolt hole is 35mm. It is believed that the distance between the two bolt holes is b=300mm.

[0035] The specific preloading operation includes the following steps:

[0036] (1) Select a pre-pressing site with an area of ​​15m×15m or more, level and compact the pre-pressing site, and reserve it;

[0037] (2) Assemble the parts web bar 3, cross bar 1, short oblique bar 2, and long oblique bar 4 into two identical triangular hanging basket trusses;

[0038] (3) The cross bars 1 of the two hanging basket truss...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction. The method comprises the following ten steps: 1, selecting a precompaction field; 2, assembling the hanging basket girders; 3, symmetrically putting the two hanging basket girders on four wood pads; 4, prefixing rear anchor points; 5, assembling a middle fulcrum point block; 6, mounting a hanging basket loading system; 7, measuring the relative position size of the two hanging basket girders before loading; 8, loading and measuring the relative position size of the two hanging basket girders; 9, unloading and measuring the relative position size of the two hanging basket girders; and 10, calculating and analyzing according to measurement data. The method has the advantages that the precompaction on bridge can be substituted, thus heavy workload for suspending sandbags can be avoided; the precompaction work efficiency is effectively quickened so as to save massive precompaction construction time; load can be applied by the jack, and precompaction data can be accurately controlled; and the precompaction process and observation process of the hanging basket are performed in the field with high safety and strong controllability.

Description

technical field [0001] The invention belongs to the technical field of bridge construction, and in particular relates to a hanging basket truss used for hanging construction of a bridge hanging basket. Background technique [0002] With the continuous development of bridge engineering construction, there are more and more types of bridge structures. As a widely used construction method, hanging basket cantilever construction has also been used more and more. In hanging basket hanging construction, the hanging basket is a necessary construction measure component. During construction, the rear end of the hanging basket is anchored on the poured concrete bridge section, the fulcrum is supported on the poured concrete beam end, and the front end is hung The bottom form, side form and inner form of the beam section to be poured form the concrete pouring conditions. With the concrete pouring of each beam section, the hanging basket is gradually pushed forward for construction. T...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D21/10
Inventor 董燕囡杨玉龙张坤焦宁艳杨立胜李明
Owner THE 4TH CONSTR ENG CO LTD OF CHINA RAILWAY NO 4 ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products