Construction process for blowing-filling sludge and reclaiming land from sea and device thereof
A technology of land reclamation and silt filling, which is applied in the direction of the device where the axis of the swirling flow can be reversed, the filling of land, and the swirling device, etc., which can solve the problems of inability to follow up construction and slow deposition of silt.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0038] In a land reclamation site on a seashore, the mud discharged from the overflow device 6 in the sludge dehydration and classification system A of the present invention is blown and filled to a height of 2 meters in the enclosure to form the foundation sludge layer. A layer of braid is laid on the surface of the basic mud layer. The braid is a two-dimensional structure braided by wattle, which can effectively prevent the concentrated mud with coarse particle size and high mass density from sinking into the low-density basic mud layer.
[0039] The coarse particle concentrated mud separated in the sludge dehydration and classification system A is mainly powder particles with a particle size of less than 50 μm, and a curing agent needs to be added, and the amount of curing agent cement is 8%. The total speed at which 20 conical main body devices 4 are input to the mud and curing agent mixing device 9 through the underflow device 5 is 0.03 tons / second, and the speed at which...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com