Method for undisturbed relocation and recovery of soil and die for fixing undisturbed earthwork
A soil, undisturbed technology, used in land preparation methods, agricultural machinery and implements, rigid containers, etc., can solve the problems of soil chaos, soil porosity damage, and difficulty in restoring soil compactness, and achieve smooth cut surfaces and maintain the original state. The effect of maintaining soil originality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Example 1 The "Zhengzhou Key Field Scientific Observation and Experimental Station of the Movable Soil Ecological Environment of the Ministry of Agriculture" established in 1988 is one of the seven bases in the national "Soil Fertility Base Network" and the only one in the Huanghuaihai region. Locate the monitoring base. However, with the rapid expansion of the city, the test base has been located in a busy city. Due to the impact of the urban island environment, climate and human factors, it had to be relocated. The method steps are as follows:
[0032] (1) Excavation of foundation pits Excavated foundation pits suitable for the volume and shape of the soil to be relocated at the Henan Academy of Agricultural Sciences Modern Agricultural Science and Technology Experimental Demonstration Base in the suburbs of Zhengzhou City;
[0033] (2) Saw the soil Excavate a working surface of appropriate size (10m×15m) in the appropriate area of the soil to be relocated, as a spa...
Embodiment 2
[0040] Embodiment 2 A soil original state relocation and restoration method is basically the same as in Embodiment 1, the difference being that in step (2), the depth of the soil sawing is 120 cm; in step (3), the straight square The soil column is cut into a cuboid shape (100cm×80cm×120cm); the vegetation restoration step is not included. The structural form of used fixed mold is identical with embodiment 1, and its volume size is adapted to the earthwork in this example.
Embodiment 3
[0041] Embodiment 3 A soil original state relocation and restoration method is basically the same as in Embodiment 1, the difference is that in step (2), the soil is sawed into an upright regular triangular soil column; in step (3), Cut the soil column into a regular triangular prism (120cm in length on the bottom side and 100cm in height). The enclosure body of fixed mold used is the triangular prism shape that matches with regular triangular prism, and cutting base plate is equilateral triangle, and all the other are substantially the same as the fixed mold in embodiment 1, and its volume size is adapted to the earthwork in this example.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com