Break-of-gauge beam for large and long foundation pits and construction method thereof
A technology of rail crossing and foundation pit, which is applied in the direction of rail system, trolley crane, load hanging element, etc., to achieve the effect of simple construction, convenient maintenance, simple and compact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0028] In this embodiment, steel sleepers 2 are laid on the cross-rail beam of the present invention and the conventional reinforced concrete crown beam to form two gantry crane rails 3 of gantry crane 8, so that the space at the working well of the foundation pit can be effectively utilized to the greatest extent. , which solves the problem of narrow space and difficult layout at the working well. Such as figure 1 , figure 2 and image 3 As shown, the present invention is used for the cross-rail beam of long foundation pit, and it comprises base body 1 and the steel sleeper 2 that is used to install gantry crane track 3, and steel sleeper 2 is fixed on the top of base body 1, and described base body 1 is made of several pieces of shellfish. Mine sheet 4 is formed by being connected by pin shaft. In this embodiment, in order to p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com