Embankment reinforcement replacement borrow technological process
A process method and embankment technology, which is applied in the field of embankment reinforcement soil borrowing technology, can solve the problems of farmers' resistance, long distance of soil material transportation, and impact on crop yield, etc., and achieve the effect of improving project construction efficiency and reducing investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0049] 1. Project overview
[0050] The Huaibei Dike Reinforcement Project. The length of the reinforced embankment section of the Huaiyuan section of the right dike of the Guohe River is 53.71km, and the embankment construction requires about 2.23 million m of earth. 3 , The first approved soil materials are all land acquisition, including 1140 mu of land permanently acquired in the embankment, 1143 mu of land temporarily acquired for reclamation, and 47.9 mu of land temporarily acquired on the Bund. The amount of land requisitioned is relatively large, but the area along the Huaihe River is more populated and less land, with an average of less than 1 mu, and only 0.3 mu in some areas. Land acquisition is very difficult.
[0051] According to the topography and geological analysis along the embankment, because the project area is located in the Huaibei Plain area of our province, the terrain in the area is flat and the ground elevation difference is small. After the soil is tak...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com