Construction method of mobile type bracket subsection cast-in-situ continuous beam

A construction method and a mobile technology, which is applied in the construction field of small and medium-span prestressed concrete continuous beams, and can solve the difficulties of using the mobile formwork method and jacking method, affecting navigation, flood discharge and road traffic, and large investment in temporary facilities. problem, to achieve the effect of reducing the disassembly and installation of the bracket, the construction is fast, convenient and flexible, and the amount of steel is reduced

Inactive Publication Date: 2008-10-08
CHINA RAILWAY 12TH BUREAU GROUP 7TH CORPORATION LIMITED +1
View PDF0 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] In the construction of existing bridges, some large or extra-large bridges are designed with variable cross-section continuous beams. There are requirements for uninterrupted traffic and flood discharge in the rainy season. If the above-mentioned full-house support cast-in-place method is used for this type of bridge, the support must be erected across the river or across the road, which will affect navigation, flood discharge and road traffic, and it is not feasible; Basket cantilever pouring method may need to invest in multiple sets of hanging baskets and corresponding supporting equipment, the amount of temporary steel used in construction is large, and the investment in temporary facilities is large, which is not economically advantageous; Therefore, the above-mentioned moving formwork method and pushing method are also difficult to use

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of mobile type bracket subsection cast-in-situ continuous beam
  • Construction method of mobile type bracket subsection cast-in-situ continuous beam
  • Construction method of mobile type bracket subsection cast-in-situ continuous beam

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] A certain super-large bridge is a railway passenger-dedicated bridge across the urban development zone. The bridge is 1564.9 meters long and 13.4 meters wide. The 10#~13# piers of the bridge are (32+48+32)m prestressed concrete continuous beam. Piers 10# and 11# are located in the middle of the river, with a main span of 48m spanning Jiangbin Avenue, the main road of the urban development zone, and the embankment of the river. The height is 3.4m, the height of the mid-span girder is 2.8m, the top width of the box girder is 13.4m, the thickness of the top plate is 34-60cm, the thickness of the web is 40-70cm, the local widening is 95cm, and the thickness of the bottom plate is 30-90cm; There are 5 transverse diaphragms in the mid-span; the distance from the center line of the side support to the end of the beam is 0.55m, the distance from the center of the transverse bridge of the side support is 4.8m, and the distance from the transverse bridge of the middle support is ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of movable support section cast-in-place continuous beam, which comprises the following steps: first perform the treatment for different topography and relief cases under the to-be-constructed continuous beam, and then install movable support system and perform the construction of 0# / SUB> beam section, and then utilize the movable support system to finish the construction of each beam section of the continuous beam body, finally utilize the movable support system to finish the construction of closure section of both side span and middle span, so as to finish the construction of the continuous beam. The construction method provided by the invention has the advantages of strong universality, safety and operability, good economic benefit, less technical difficulty, easy grasp and control, thereby being widely applied in the field of medium-small span continuous beam construction.

Description

technical field [0001] The invention belongs to the construction field of concrete continuous beams, in particular to a construction method of small and medium-span prestressed concrete continuous beams. Background technique [0002] Prestressed concrete continuous beam has become the first choice of many bridges due to its advantages of high rigidity, smooth driving and good seismic performance. The commonly used construction methods are: [0003] 1. The cast-in-place method of the full hall support: this method sets up the support formwork system within the entire span of the beam, and binds the steel skeleton, reserves the prestressed tunnel, and then pours the beam concrete on site, and performs prestressed tension when it is cured to the specified strength Work. During construction, it is necessary to set supports for each joint and span of the continuous beam. After the construction of one joint is completed, the support is removed from the entire joint. Therefore, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D101/28
Inventor 肖乾珍符能松陈济洲崔红琴何碧波
Owner CHINA RAILWAY 12TH BUREAU GROUP 7TH CORPORATION LIMITED
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products