Construction method of subsurface excavation and layer added by using top layer of existed basement as native cover board
A basement roof and construction method technology, applied in underground chambers, water conservancy projects, artificial islands, etc., can solve problems affecting the relocation of ground transportation pipelines and restricting the widespread use of urban central areas
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] Hereinafter, the method of the present invention will be described in detail by taking an example of adding floors to an underground shopping mall on the west side of Shanghai Metro Line 1.
[0015] like figure 1 As shown, the structure is an underground shopping mall structure with only one floor. The shopping mall structure includes a top plate 1 and a bottom plate 2, and a plurality of local columns 3 are supported between the top plate 1 and the bottom plate 2; An inner lining 4 is provided, and reinforced concrete sheet piles 5 are respectively arranged on the outer side of the inner lining 4 to serve as the envelope structure of the underground structure. Generally, in order to ensure that the underground structure is not squeezed by its outer soil layer, the length of the sheet pile is often twice the vertical height of the underground structure.
[0016] It should be noted that since the existing basement area is often large, construction can be carried out in ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com