Cable and plate dam
A face plate and high tensile strength technology, applied in water conservancy projects, sea area projects, coastline protection, etc., can solve the problems of increasing engineering quantity and project investment, high requirements for dam abutment geological conditions, etc. Construction machinery and equipment and construction occupy less land and the effect of simple construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] Embodiment 1: Use high-strength steel wires to make steel wire bundles or steel strands, and anchor the two ends of the steel wire bundles or steel strands in the mountains on both sides of the valley with cement concrete or cement mortar and anchorages respectively to form cross-valley pulls. Cables, multiple valley-crossing cables are distributed according to different elevations, and are on the same one-dimensional or two-dimensional surface. Fix the high-strength fiber-reinforced rubber plate on the cable and make the pressure-bearing surface on the upstream side of the cable. The adjacent rubber plates are connected with adhesive to form an integral panel, and the periphery of the panel is respectively embedded with cement concrete or mortar. In the river bed and bank slope rock mass, together with the valley-crossing cable, a water-tight water-blocking body is formed. When the reservoir is storing water, the water blocking panel transmits the water pressure to the...
Embodiment 2
[0018] Embodiment 2: High-strength organic fibers are twisted into a cable, and the two ends of the cable are respectively anchored in the mountains on both sides of the valley with cement concrete or mortar and anchors to form the main cable across the valley. At the same time, the vertical stay cables and the main stay cables are used to form a net, and the high-strength fiber-reinforced plastic plate is fixed on the cable net, and the two form a cable slab dam according to the method described in Example 1.
Embodiment 3
[0019] Embodiment three: use the inorganic non-metallic fiber with high tensile strength to make dragline, make panel with metal simultaneously, by the method described in embodiment one dragline is anchored in the mountains on both sides of the river valley, then according to embodiment one The method described uses such cables and panels to form a cable slab dam.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com