Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Cast-in-place concrete pile construction method based on BIM technology

A construction method and concrete technology, which is applied in the field of construction engineering and concrete pouring pile construction, can solve problems such as poor traceability, inability to adapt, and untimely feedback of concrete pouring conditions, so as to prevent final hole errors and improve the company's brand.

Pending Publication Date: 2022-08-09
中建新越建设工程有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, BIM technology integrates various data information of the project through the three-dimensional model of the concrete pouring pile project, and then simulates the real information of the pile concrete pouring project through the data information, but there are still large-scale concrete pouring pile projects, pile types, There are many problems, different design technical parameters, large amount of construction information, etc., and when the existing concrete pouring piles are constructed, the on-site construction still adopts the traditional paper bills as the management basis, and the manual sampling inspection of the weighbridge is used as the measurement method. The management and control methods and The means are still in the "people-oriented" control mode, which can no longer adapt to the current development of construction site informatization; its shortcomings are mainly reflected in:
[0004] 1. The management efficiency is low, and the information feedback on the concrete pouring situation is not timely and synchronized, which is not conducive to the understanding of the site situation by all relevant units;
[0005] 2. The management cost is high. From entering the site to the completion of concrete pouring, a lot of labor costs are spent to collect vouchers and make statistics;
[0006] 3. The traceability is poor, and the quality problems cannot be traced back to the concrete pouring location;
[0007] 4. Poor intuition and visibility

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cast-in-place concrete pile construction method based on BIM technology
  • Cast-in-place concrete pile construction method based on BIM technology
  • Cast-in-place concrete pile construction method based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention will be described in detail below with reference to the accompanying drawings and embodiments, examples of which are shown in the drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary, only used to explain the present invention, and should not be construed as a limitation of the present invention.

[0034] In the description of the present invention, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", The orientation or positional relationship indicated by "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A cast-in-place concrete pile construction method based on the BIM technology comprises the steps that firstly, a construction area is built, a protective fence is built on a construction site, and an access door is arranged; step 2, building a BIM model: A, determining a model precision requirement: determining the precision of each model according to a design requirement; b, drawing a complex terrain: according to the geological exploration report, constructing a drawn terrain which is equal to the construction site in proportion in the revit; c, engineering pile reinforcing steel bar drawing, wherein engineering pile drawing is conducted according to engineering pile design drawing reinforcing steel bar nodes, and reinforcing steel bars automatically change according to different pile lengths; the invention aims to provide a BIM technology-based cast-in-place concrete pile construction method which can provide more intuitive, more accurate and faster construction information under the engineering conditions of complex engineering form, tight construction period and large engineering information amount, and a construction management and control system which is high in management efficiency, low in management cost, good in traceability, more intuitive and better in visibility.

Description

【Technical field】 [0001] The invention relates to the technical field of construction engineering, in particular to the technical field of concrete cast-in-place pile construction. 【Background technique】 [0002] Building Information Modeling (English name: Building Information Modeling, also known as Building Information Modeling, BIM for short) is a building or construction engineering information model that is composed of sufficient information to support the development and management of new products and can be directly interpreted by computer applications, that is, digital technology. Supported life cycle management of the built environment, it is a new tool for architecture, engineering and civil engineering, pioneered by Autodesk in 2002. [0003] At present, BIM technology integrates various data and information of the project through the three-dimensional model of the concrete cast-in-place pile project, and then simulates the real information of the pile concrete c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/08G06F30/13G06F30/20
CPCG06Q10/103G06Q10/0633G06Q50/08G06F30/13G06F30/20Y02A10/40
Inventor 唐成舟蒋欣恒李宽顾亚帅罗磊刘伟李若波蒋利生许东
Owner 中建新越建设工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products