Method for inverting fracture position of end top plate of gob-side entry retaining
A technology of retaining entry and roof, which is applied in the direction of earthwork drilling, mining equipment, mining equipment, etc., and can solve the problems of difficult detection and control of timing and position
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] In order to make the objectives, technical solutions and advantages of the present invention clearer, the technical solutions in the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention. , not all examples. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0031] Combine below Figure 3-Figure 5 Describe a method of the present invention for inverting the fracture position of the roof at the end of a gob-side entry retaining. The method for inverting the fracture position of the roof at the end of the gob-side entry retaining includes using three kinds of monitoring data to invert the breaking law of the roof at the end, which specifically includes:
[0032] First,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com