Ship loading and unloading operation plan real-time adjustment method adopting simulation rehearsal
A technology for job planning and real-time adjustment, applied in forecasting, computing, data processing applications, etc., can solve problems such as disordered job order, and achieve the effect of solving resource waste, improving work efficiency, and reducing time costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, but not all of the embodiments.
[0017] The real-time adjustment method for loading and unloading ship operation plans provided by the present invention adopts simulation rehearsal. Based on the simulation allocation strategy, on the basis of ensuring the operation efficiency of the quay crane, the operation cost of the quay crane and the operation efficiency of the yard, the simulation deduction process is used to output the operation plan of the quay crane, Plan the operation sequence or sequence of each position of the ship; according to the loading and unloading bridge operation position and operation time output by the quay crane plan, and consider the actual loading and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com