Method for blocking upward pumping of structure development type broken ore body under water body
A technology of ore body and structure, which is applied in the field of upward pumping of structurally developed broken ore bodies under the blocking water body, so as to save manpower and financial resources, ensure safety and daily production.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, detailed description will be given below with reference to the accompanying drawings and specific embodiments.
[0041] The invention provides a method for blocking the upward pumping of broken ore bodies with developed structures under water bodies.
[0042] The method includes the following steps:
[0043] Include the following steps:
[0044] S1: The upper wall and lower wall along the vein roadway and the lower wall along the vein roadway are constructed along the strike of the ore body on the upper wall and lower wall of the ore body;
[0045] S2: Micro-shield machine is used for the construction of the tunnel tunnels on the upper side and the lower side tunnels, and the distance between the center lines of the two adjacent tunnel tunnels is 6m to 8m;
[0046] S3: After the excavation of the vein-piercing tunnel is completed, drill grouting h...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com