Deep soil sampling and sample separation detection method
A deep soil and detection method technology, applied in the direction of soil material testing, sampling devices, material inspection products, etc., can solve the problems of mutual contamination of soil samples, inability to give effective predictions, poor sampling reliability, etc., to avoid sample Confusion, prevention of mutual contamination problems, effects of contamination prevention
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] In this embodiment, sampling is carried out at a certain soil sampling point, and the sampling depth is 2 meters, and vertical layered sampling is carried out at 0.5 meters, 1 meter and 1.5 meters respectively.
[0046] A method for deep soil sampling and sub-sample detection, comprising the steps of:
[0047] Step 1, pre-drill the holes:
[0048] Select the sampling site, and then use a drilling machine to pre-drill the hole. The hole is a vertical hole with a depth of 1.8 meters;
[0049] Step 2, sampling:
[0050] Take out the drill bit of the drilling machine to form a hole in the soil layer; perform simultaneous layered sampling on the side wall of any angle of the hole, make the 0 scale of the sampling rod flush with the ground surface, and determine the number of layered sampling points as 3 points according to the detection needs, that is, 0.5 meters , 1 m and 1.5 m;
[0051] Step 3, sub-sample:
[0052] The three layered soil samples taken out were divided ...
Embodiment 2
[0060] In this embodiment, sampling is carried out at a certain soil sampling point, and the sampling depth is 2 meters on the slope, and layered sampling is carried out at 1 meter, 1.5 meters and 2 meters respectively on the slope.
[0061] A method for deep soil sampling and sub-sample detection, comprising the steps of:
[0062] Step 1, pre-drill the holes:
[0063] Select the sampling site, and then use a drilling machine to pre-drill. The drilling is an inclined drilling, the inclination is 50°, and the depth of the inclined drilling is 1.8 meters;
[0064] Step 2, sampling:
[0065] Take out the drill bit of the drilling machine to form a hole in the soil layer; carry out simultaneous layered sampling on the upper surface of the hole, make the 0 scale of the sampling rod flush with the ground surface, and the number of layered sampling points is 3 points, that is, the slope is 0.5 meters, 1 meter and 1.5 meters depth;
[0066] Step 3, sub-sample:
[0067] The three l...
Embodiment 3
[0076] In this embodiment, sampling is carried out at a certain soil sampling point, and the sampling depth is 2 meters, and vertical layered sampling is carried out at 1 meter, 1.5 meters and 2 meters respectively.
[0077] A method for deep soil sampling and sub-sample detection, comprising the steps of:
[0078] Step 1, pre-drill the holes:
[0079] Select the sampling site, and then use the drilling machine to pre-drill the hole, the hole is a vertical hole, and the depth of the hole is 2.2 meters;
[0080] Step 2, sampling:
[0081] Take out the drill bit of the drilling machine to form a hole in the soil layer; carry out simultaneous layered sampling on the side wall of any angle of the hole, make the 0 scale of the sampling rod flush with the ground surface, and determine the number of layered sampling points as 3 points according to the detection needs, that is, 1 meter , 1.5 meters and 2 meters;
[0082] Step 3, sub-sample:
[0083] The three stratified soil sampl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com