An installation method and flatness technology, which are applied in the field of prefabricated wall panel installation that can quickly adjust the flatness of the wall surface, can solve the problems of slowing down the hoisting speed and trouble, and achieve the goal of improving the installation speed, facilitating installation, and ensuring horizontal and straight installation. Effect

Pending Publication Date: 2022-04-22
陈洁
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In the hoisting work of the existing fixed keel and movable keel, whether they are hoisted separately, connected to the wall or connected to each other, frequent leveling work is required. The traditional leveling work is carried out by infrared rays. This method is quite cumbersome to operate, and the leveling work cannot be carried out together with the installation work, which seriously slows down the hoisting speed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fabricated wallboard mounting method capable of quickly adjusting flatness of wall surface
  • Fabricated wallboard mounting method capable of quickly adjusting flatness of wall surface
  • Fabricated wallboard mounting method capable of quickly adjusting flatness of wall surface

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0050] Refer to attached figure 2 , the auxiliary steel frame keel assembly 3 also includes an end steel frame 31, one end of the end steel frame 31 is equidistantly fixedly connected to the inner wall of one side of the building floor 1, the other end of the end steel frame 31 is spliced ​​with a splicing steel frame 32 one by one, and the end Both the steel frame 31 and the spliced ​​steel frame 32, and between the two spliced ​​steel frames 32 are connected by the fixed fixture 6;

[0051] Refer to attached image 3 One end of the end steel frame 31 and one end of the splicing steel frame 32 are fixedly provided with an insertion end 321, and the other end of the splicing steel frame 32 is fixed with an access slot 322 inside, and the insertion end 321 is inserted into the adjacent access slot 322. Inside, the two side walls of the insertion end 321 are fixed with positioning holes 323, and the two side walls of the access groove 322 are fixed with a row of holes 324 at e...

Embodiment 2

[0057] Refer to attached Figure 9 , the wall leveling aids 8 are spliced ​​with the two end steel frames 31 one by one, and the wall leveling aids 8 are attached to the inner wall of the building floor 1 on which the end steel frames 31 are installed, and the wall leveling aids 8 also include a main body 801 , both ends of the main body 801 are slidingly installed with inner rods 804, and the ends of the two inner rods 804 are fixedly provided with L-shaped support platforms 805, and the lower surfaces of the L-shaped support platforms 805 are fixedly provided with support brackets 806, In addition, the main pipe body 801 and the support frame 806 are both fitted to the inner wall of the building floor 1, and the L-shaped support platform 805 is fitted to the end steel frame 31. After the first end steel frame 31 is fixed, the wall is leveled. The auxiliary device 8 fits the wall surface, and ensures that the support frame 806 is close to the wall surface, and the first end s...

Embodiment 3

[0061] Refer to attached Figure 5 , the leveling installer 7 is spliced ​​with the boom 4 one by one, the boom 4 is fixedly connected to the main steel frame keel 2 through the boom connector 41 connected at the bottom end, and the boom connector 41 is set on the main steel frame keel 2 The lower surface of the boom connector 41 is fixedly provided with a leveling boss 42 .

[0062] Refer to attached Figure 5 , the leveling installer 7 also includes an outer screw tube 701, the inner screw rod 702 is connected to the inner movable screw of the outer screw tube 701, and the top of the inner screw rod 702 is fixedly connected with a top support plate 703, and the top support plate 703 fits inside the building floor 1 On the ceiling surface, a fork plate 704 is fixed on the outer wall of the bottom end of the outer coil 701, and the fork plate 704 is movably sleeved on the outer surface of the leveling boss 42, and the inner screw 702 is rotated to adjust the top support plate...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of indoor decoration, and particularly relates to a fabricated wallboard mounting method capable of quickly adjusting wall flatness, comprising a building floor, a leveling installer and a wall leveling assistor, main steel frame keels are fixedly connected to the lower surface of a ceiling in the building floor at equal intervals; the main steel frame keels are fixedly connected with the building floor through suspenders which are connected at equal intervals, auxiliary steel frame keel assemblies are fixedly connected to the positions, located below the main steel frame keels, in the building floor at equal intervals, and the single main steel frame keel and the single auxiliary steel frame keel assembly are connected in a 90-degree mode. The main steel frame keel and the auxiliary steel frame keel assembly are fixedly connected through arranged steel frame connecting pieces. According to the device, hoisting work of the main steel frame keel can be completed at a time, leveling work and installation work are carried out at the same time, the device is easy and rapid to operate, in addition, installation of an auxiliary steel frame is facilitated, and the device has the advantages of being adjustable in length and high in connection speed.

Description

technical field [0001] The invention belongs to the technical field of interior decoration, and in particular relates to a method for installing a prefabricated wall panel for quickly adjusting the flatness of a wall surface. Background technique [0002] The keel frame is a kind of building material used to support the shape and fix the structure. It is used as the skeleton and base material of the building decoration structure. It is composed of a fixed keel and a movable keel. The shape of the movable keel is basically the same as that of the fixed keel, except that the upper end is curved. , the hook is hung on the upper end of the fixed keel, this kind of keel is easy to install and remove the decorative panel; [0003] The fixed keel includes vertical ribs, folded heads, and bottom plates. The folded head is at the top of the vertical ribs, the bottom plate is at the bottom of the vertical ribs and is at right angles to the vertical ribs, and the shape of the fixed kee...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04F13/22E04F13/23
CPCE04F13/0805E04F13/0803
Inventor 陈洁
Owner 陈洁
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products