Tunnel arch dismounting and replacing auxiliary trolley and construction method thereof
The technology of an arch trolley and a trolley is applied in the field of an auxiliary trolley for dismantling and replacing an arch in a tunnel and its construction, and the field of an auxiliary trolley for changing an arch, which can solve the problems of slow construction progress, low efficiency, safety threats to construction personnel and equipment, and the like. Achieve the effect of suppressing continuous deformation, ensuring safety, and achieving reusability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] see Figure 1~4 , an auxiliary trolley for tunnel arch replacement, including
[0049] Temporary protection arch 1, which is arranged on the outside of the portal frame of the auxiliary trolley, and is designed in a double-arch frame and segmented;
[0050] The working platform 5 is used to provide working space for the staff, and is located in the middle of the temporary protective arches 1 on both sides, and is fixed on the steel frame of the auxiliary trolley by welding;
[0051] Horizontal slide rail 7, which is used to drive the temporary protection arch 1 to move back and forth along the longitudinal direction of the tunnel, and it is set on both sides of the steel frame of the auxiliary trolley, and is located on the side where the temporary protection arch 1 is installed. Below the door frame.
[0052] In the embodiment of the present invention, one of the ends of the temporary guard arches 1 in the adjacent segment is designed as a groove, and the other is de...
Embodiment 2
[0059] see Figure 5-7 , an auxiliary trolley for tunnel arch replacement, the construction method of which comprises the following steps
[0060] (1) Preparation before construction
[0061] ① Set up settlement observation points. In the arch change section, the monitoring and measurement points are encrypted. The distance between each monitoring point is determined according to the actual situation on the site. The surveyors strengthen the observation frequency and feed back the data to the on-site technicians in time to ensure that the deformation of the surrounding rock is within the safe allowable range. The arch changing trolley enters the site for construction.
[0062] ② Carry out a comprehensive inspection of the mobile arch changing trolley to ensure that all functions of the trolley are normal. Adjust the steel arch size of the temporary arch protection on the arch changing trolley to ensure that the trolley can enter the site smoothly without touching the tunnel...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com