Negative excavation blasting structure and method for nuclear island corridor foundation pit
A ring corridor and foundation pit technology, applied in blasting and other directions, can solve the problems of failing to achieve the ultimate goal of foundation pit excavation, weakening the damage force of the main blasting to the wall of the ring corridor, and large blasting vibrations.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The following are specific embodiments of the present invention and in conjunction with the accompanying drawings, the technical solutions of the present invention are further described, but the present invention is not limited to these embodiments.
[0037] Such as Figure 1-3 As shown, a negative excavation blasting structure of the ring gallery foundation pit of the nuclear island of the present invention is formed by enclosing the blasting area 1 of the ring gallery foundation pit by the inner ring line 2 and the outer ring line 3;
[0038] The blasting area 1 of the ring corridor foundation pit is divided into multiple blasting intervals, and the multiple blasting intervals are divided into two first blasting intervals 101, two second blasting intervals 102, and two third blasting intervals 103 along the direction close to the protected area. and two fourth blasting intervals 104;
[0039] A plurality of first pre-split holes 201 are arranged at intervals on the i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com