Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Flexible interconnection substation optimization scheduling method based on B2B-MMC

A technology for optimal dispatching and substations, applied in the direction of constraint-based CAD, design optimization/simulation, electrical components, etc., can solve problems such as large average voltage deviation of connected nodes of converters, network loss of high-voltage distribution network, etc., to achieve optimal coordination Control and reduce network loss, improve the effect of controllable level

Pending Publication Date: 2022-02-01
GUIZHOU POWER GRID CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The technical problem to be solved by the present invention is to provide a B2B-MMC-based flexible interconnection substation optimization scheduling method to solve technical problems such as network loss of high-voltage distribution network and large average voltage deviation of nodes connected to converters.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Flexible interconnection substation optimization scheduling method based on B2B-MMC
  • Flexible interconnection substation optimization scheduling method based on B2B-MMC
  • Flexible interconnection substation optimization scheduling method based on B2B-MMC

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The present invention will be further described below in conjunction with accompanying drawings and examples.

[0043] The back-to-back modular multilevel converters are used to replace the main transformer 10kV bus tie switches in different substations. According to the optimization model of the flexible interconnected substation, the optimal operating point with the smallest network loss and the smallest node voltage deviation is solved. It is characterized in that according to the selected actual high-voltage distribution network model, B2B-MMC is used to replace the 10kV bus tie switch of the main transformer, and according to the optimal scheduling method of the flexible interconnected substation constructed, the particle swarm algorithm and alternate iteration method are used to solve the high-voltage distribution network operation. The best point is to realize the optimal collaborative control among multiple flexible interconnected substations and the active regu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a flexible interconnection substation optimization scheduling method based on B2B-MMC, and the method employs a back-to-back modular multilevel converter to replace different transformer substation main transformer 10kV bus interconnection switches, and builds a flexible interconnection substation optimization model. The method comprises the following steps: for an actual high-voltage power distribution system in a certain place, taking network loss minimization as an optimization target, considering node voltage margin constraints, adding an optimization model established by a voltage out-of-limit penalty term in a target function, and solving active and reactive power output of a current converter by adopting an alternating iteration method and a particle swarm algorithm; optimized cooperative control among a plurality of flexible interconnection substations and active regulation and control of system power flow are realized, and the operation controllable level of a high-voltage power distribution network is improved. A simulation result shows that the B2B-MMC-based flexible interconnection substation optimal scheduling method can effectively reduce the network loss of a high-voltage power distribution system, improves the average voltage deviation of nodes connected with a converter, and verifies the effectiveness and rationality of the control method provided by the invention.

Description

technical field [0001] The invention relates to an optimal scheduling method based on an intelligent soft switch, in particular to a B2B-MMC-based optimal scheduling method for flexible interconnected substations. Background technique [0002] With the rapid development of the economy, society and power grid, users' demand for power is showing a trend of diversification. The traditional distribution network is facing many challenges, such as equipment overload, increased network loss, and low power quality. In order to alleviate the above problems, the traditional distribution network reconfigures the structure of the distribution network by opening and closing the tie switches between the feeders of the distribution network. However, due to the limited switching times of the equipment, it is impossible to realize the infinite dynamic adjustment of the power flow. The use of intelligent soft switches to replace contact switches has attracted widespread attention from schola...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/36H02J3/00G06F30/20G06F111/04
CPCH02J3/36H02J3/00G06F30/20H02J2203/20G06F2111/04Y02E60/60
Inventor 班国邦张腊华袁旭峰吕黔苏刘丽杨文勇杜伟毛先胤陈沛龙杨旗张露松邹雕杨柳青
Owner GUIZHOU POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products