Expressway guardrail with intelligent dust suppression and pavement maintenance functions and installation method
A technology for highways and guardrails, applied in road safety devices, road cleaning, roads, etc., can solve problems such as aggravating traffic accidents, narrowing sight range, broken guardrails, etc., and achieve the effect of saving water resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] A highway guardrail with intelligent dust suppression and road surface maintenance functions, refer to figure 1 ,include:
[0031] Guardrail body 5, guardrail body 5 is provided with connecting plate 7 along the first end of length direction, and the second end is provided with connecting socket 13, and connecting plate 7 is inserted in the connecting socket 13 on the guardrail body of another expressway guardrail, with Realize the connection between highway guardrails; the bottom of the guardrail body 5 has a card slot 6 connected to the ground;
[0032] The sprinkler dust suppression and maintenance unit, the sprinkler dust suppression and maintenance unit includes at least one water pipe 1 arranged on the guardrail body 5, a plurality of nozzles 2 are arranged on the water pipe 1, and the spraying direction of the nozzles 2 points to the construction road surface; The water pipe 1 is connected with the water pipe 1 on the guardrail body 5 of another expressway guard...
Embodiment 2
[0044] An installation method of an expressway guardrail with intelligent dust suppression and road surface maintenance functions, using the expressway guardrail with intelligent dust suppression and road surface maintenance functions provided by embodiment 1, the installation method includes the following steps:
[0045] S10. Fix the first expressway guardrail to the ground through the slot 6 at the bottom of the guardrail body 5 at an appropriate position.
[0046] S20, install the second expressway guardrail, insert the connection plate 7 of the first expressway guardrail into the connection socket 13 of the second expressway guardrail, and connect; in the connection between the first expressway guardrail and the second expressway guardrail During the process, it should be ensured that the first expressway guardrail is aligned with each part of the second expressway guardrail;
[0047] S30. Fixedly connecting the guardrail of the second expressway with the ground;
[0048]...
Embodiment 3
[0054] During the reconstruction and expansion of a highway, the existing highway and the highway under construction were only separated by ordinary steel guardrails, and no other protection measures were taken. There are many risks in such a partition. First, a large amount of dust will be generated during the construction of the line, which will affect the safety of driving on the existing line. Second, the connection between the ordinary steel guardrails is not strong enough. When an accident occurs, the ordinary steel guardrails will not be effective. In addition, there is no warning device in the process of driving at night, so there is a great potential risk.
[0055] This embodiment can be applied to the reconstruction and expansion construction of this expressway. First, install the expressway guardrail (temporary guardrail) one by one, and make it reliably connected with the ground, then connect the power supply and water source, turn on the sprinkling dust suppression...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com