Project total contract project cost management method based on information system

An information system and cost management technology, applied in the field of cost management of general contracting projects based on information systems, can solve the problems of lack of effective methods for continuous improvement of cost management and insufficient utilization of cost data, so as to promote continuous improvement, Realize the effect of mining the utilization value

Pending Publication Date: 2021-12-03
POWERCHINA CHENGDU ENG
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Through the establishment of the project cost management information system, the standardization of project cost management has been realized, and the project cost data has been collected and stored in a centralized manner, providing a data support and management platform for cost control, accounting and analysis, but the current cost management system is not sufficient Mining the utilization value of cost data lacks an effective method to promote continuous improvement of cost management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project total contract project cost management method based on information system
  • Project total contract project cost management method based on information system
  • Project total contract project cost management method based on information system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] In order to make the objectives, technical solutions and advantages of the present invention, the following detailed description will be described below in connection with the examples. It is to be understood that the specific embodiments described herein are intended to explain the present invention and is not intended to limit the invention.

[0020] The method of the present invention is implemented based on the cost management system of the project system of the project system. At least the budget management module is set in the system: the project income budget management and project cost budget management, the settlement module settlement results and corresponding The budget is compared to compare project cost analysis; contract management module: for project contract management; change claim management module: used for project changes and claim management; settlement management module: used for project engineering quantity settlement and progress settlement managemen...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of engineering project cost management, and provides an project total contract project cost management method based on information system in order to realize mining of cost data utilization value, which comprises the following steps: 1, compiling a project total budget according to a budget subject; 2, inputting contract related basic information and project quantity list data; 3, performing settlement according to the construction condition, if the settlement is not in the contract, performing change claim firstly and then performing related settlement, and if the settlement is in the contract, performing related settlement directly; and step 4, comparing the settlement result with the budget and completing project cost analysis. By adopting the above structure, integration of business and finance and mining of cost data utilization value are realized.

Description

Technical field [0001] The present invention relates to the technical field of engineering project cost management, and is specifically based on the cost management method of project general contracting projects. Background technique [0002] Project cost management refers to the management activities of project cost plans, project cost control, project cost accounting, and project cost analysis, which guarantees the cost of the project, does not exceed project cost budget. Project cost management is an important part of construction management of construction projects. Its work content runs through the construction process of the entire project, which is significant for economic benefits and social benefits to ensure the economic benefits and social benefits of construction projects. [0003] Project cost management with traditional contractors has a significant difference: traditional contractors mainly optimize construction organization arrangements, balance resource allocatio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 李正郑家祥
Owner POWERCHINA CHENGDU ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products