Mine restoration stair step soil covering method
A step and soil-covering technology, applied in the restoration of polluted soil, etc., can solve the problems such as the difficulty of covering the steps with soil, and achieve the effects of avoiding geological disasters, uniform soil covering, and stable steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] First pour the covering soil from the top layer to the next step one by one, the thickness of the covering soil is 100cm, then clean up the stones on each layer of slope and steps in turn, level the slope and the covering soil on the steps, and finally carry out layered rolling on the stones of the bottom step 3 Second, level the soil.
[0028] Using the method of the present invention to cover the soil, after 7 days of scouring and settlement, the thickness of the slope's covering soil is 90 cm, the thickness of the step's covering soil is 98 cm, and the thickness of the bottom layer of covering soil is 93 cm.
Embodiment 2
[0030] First pour the covering soil from the top layer to the next step, the thickness of the covering soil is 100cm, then clean up the stones on each layer of slope and steps in turn, level the slope and the covering soil on the steps, and finally carry out layered rolling on the stones of the bottom step5 Second, level the soil.
[0031] Using the method of the present invention to cover the soil, after 7 days of scouring and settlement, the thickness of the slope's covering soil is 93 cm, the thickness of the step's covering soil is 96 cm, and the thickness of the bottom layer of covering soil is 95 cm.
Embodiment 3
[0033] First pour the covering soil from the top layer to the next step, the thickness of the covering soil is 100cm, then clean up the stones on each layer of slope and steps in turn, level the slope and the covering soil on the steps, and finally roll the stones on the bottom step 8 Second, level the soil.
[0034] Using the method of the present invention to cover the soil, after 7 days of scouring and settlement, the thickness of the slope's covering soil is 92 cm, the thickness of the step's covering soil is 98 cm, and the thickness of the bottom layer of covering soil is 98 cm.
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com