Particulate matter and noise pollution management equipment for construction engineering construction and operation method thereof
A technology for construction engineering and noise pollution, which is applied in particle suspension analysis, measurement of ultrasonic/sonic/infrasonic, suspension and porous material analysis, etc. Questions about construction arrangements, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Embodiment 1: see Figure 1-6 , the particulate matter and noise pollution management equipment for construction projects, including a box body 1, the box body 1 is an open rectangular box body placed horizontally, a door frame 23 is installed on the front of the box body 1, and a circle on the surface of the door frame 23 is provided with Sealing ring, one side of the door frame 23 is hinged with one side of the box door 4 through a pair of hinges 5, a first rectangular groove is recessed in the middle of the front of the box door 4, and an LED display 10 is installed in the first rectangular groove. A handle 6 is affixed to the other side of the front of the door 4, a second rectangular groove is recessed in the middle of the rear side wall in the box body 1, and a PLC controller 7 is installed in the second rectangular groove, and a fixed handle 6 is fixed on the bottom surface in the box body 1. Connected with an electric hydraulic cylinder 27, the electric hydrauli...
Embodiment 2
[0037] Example 2: see Figure 7 , this embodiment provides a method for operating particulate matter and noise pollution management equipment for construction projects, specifically, including the following steps:
[0038] The first step is to select the place to be monitored, check the integrity of the device, and then place the device at a designated location; the second step is to connect the power cord 11 to an external power supply, and turn on the LED display 10 through the PLC controller 7 ,; the third step, through the control switch of the electric hydraulic cylinder 27, the electric hydraulic cylinder 27 is raised, thereby driving the central rod 22 connecting rod 14 assembly to rise outside the box body 1; the fourth step, by moving the central rod 22 up and down to support 25 to adjust the angle between the two connecting rods 14, whether it is large or small or placed horizontally, then use bolts 24 to fix the support base 25, and the bolts 24 pass through the bol...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com