Processing method for electric power material share control
A processing method and technology for power materials, applied in the field of material management information system, can solve the problems of insufficient material differentiation, general material share management, inconvenient management, etc. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] Embodiment 1, a processing method for the management and control of power material shares, firstly enters the S01 dimension management step. In this step, all materials are divided into different management dimensions according to the degree of versatility of the materials themselves.
[0033] The number of management dimensions can be customized according to the actual situation. In this embodiment, it is divided into four management dimensions. There are four dimensions: bid section dimension, bid section plus material group dimension, material dimension, and material plus ID dimension. These four dimensions range from high to low in material versatility. For example, OPGW optical cables, steel strands, optical cable fittings, etc. These materials are very versatile and can be put into the dimension of the bidding section. Cable grounding boxes, closed busbar cabinets, switchgear maintenance trolleys, etc. These materials have a slightly higher versatility, so they ...
Embodiment 2
[0044] Embodiment 2, the difference from Embodiment 1 is in the calculation of the contract deduction amount C T During the process, the conditions for contract closure are set differently. In this embodiment, contract closure requires not only the expiration of the contract validity period, but also the contract execution rate. In this case, the contract execution rate is not calculated by the matching quantity of materials, but by the ratio of the matching amount of materials to the total amount of materials involved in the contract. If the total value of all the materials involved in the contract is 10 million, and the value of the matched materials is 8.6 million, the execution rate is 86%.
[0045] The user can set the execution rate threshold G of this contract, such as 80%, that is, the contract will only be closed when the contract validity period ends and the contract execution rate exceeds 80%. If the validity period of the contract ends, but the contract execution...
Embodiment 3
[0046] Embodiment 3, the difference from Embodiment 1 is that the deduction amount is in addition to the contract deduction amount C T In addition, there is an application deduction amount C S , the application deduction amount C S The number of planned demand shares that the distribution network entity applies for cancellation. If the main body of the distribution network voluntarily cancels the quantity requirement of 200 steel strands corresponding to the project during the year, then the deduction amount C of the steel strands is the contract deduction amount C T 100+C S 200=300.
[0047] To sum up, through this technical solution, first of all, all materials are divided into dimensions according to the degree of versatility, and a separate share management and control system for each dimension makes the share management of all materials more orderly. Secondly, optimize the main body of management and control, and only control the materials that need to be controlled b...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com