Electromechanical engineering management system

A technology of engineering management and electromechanical, applied in data processing applications, instruments, resources, etc., can solve problems such as improper command and dispatch, wrong working hours, and loss of working hours, and achieve the effects of eliminating engineering obstacles, accurately controlling progress, and effectively manpower

Pending Publication Date: 2021-08-06
钜镒工程有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. Unplanned construction Because there is no planned analysis and confirmation of pre-construction engineering drawings and specifications during the implementation of design drawings, so each operator cannot understand the process execution and operation content. It is caused by errors. Loss of man-hours
[0004] 2. Due to the improper command and dispatch of the management personnel of Party A and Party B, the failure to invest manpower in accordance with the priority of the project leads to the loss of man-hours for repeated construction
[0005] 3. Uncertainty in manpower demand leads to difficulties in manpower dispatching
[0006] 4. Loss of working hours due to insufficient supply of construction drawings by Party B
[0007] 5. Loss of working hours due to insufficient supply of materials by Party B
[0008] Sixth, the loss of working hours caused by the laziness of construction personnel due to insufficient management personnel
[0009] Seven. Due to insufficient inspection by management personnel, the construction personnel concealed the poor construction, resulting in missing inspection and re-doing the man-hour loss.
[0014] 12. Loss of working hours caused by repeated construction due to construction workers cutting corners
[0015] 13. Loss of man-hours due to repeated execution due to delay in design change information
[0016] 14. Loss of man-hours due to repetitive operations due to wrong instructions from the management personnel of Party A and Party B
[0017] 15. The owner is unable to obtain information about the project and expresses questions and suggestions in a timely manner

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electromechanical engineering management system
  • Electromechanical engineering management system
  • Electromechanical engineering management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0221] Such as figure 2 Shown is the basic architecture diagram of the electromechanical engineering management application program of the present invention, but these embodiments are for illustration purposes only, and are not limited by this structure in patent applications.

[0222] In order to further understand the structure and technology of the present invention, I would like to provide an in-depth description with the drawings below:

[0223] Such as figure 1 and 2 The figure shows the mechanical and electrical project management system of the present invention, which is mainly connected with the management center server 4 through the Internet 3 through the terminal device 2 of the user 1 (the owner 11 and the manager 12), so as to jointly check and manage project information, progress and An integrated innovative system for scheduling and the manager 12 to carry out engineering statistics and engineering planning, including: a user 1, who is the user of the mechani...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an electromechanical engineering management system, which is mainly connected with a management center server through a terminal device of a manager and a terminal device of a proprietor via an internet. The electromechanical engineering management system comprises: a terminal device which is a user of the electromechanical engineering management system and comprises the manager and the proprietor, wherein the terminal device is connected with the management center server through the terminal device and the internet; a management center server which comprises engineering information of an electromechanical engineering special case and is connected with the user through the internet to provide service; and an electromechanical engineering management application program which exists in the management center server and comprises a management operation interface, an owner picture operation interface, an engineering statistics operation interface and an engineering plan operation interface, so that an integrated innovation system for jointly checking and managing engineering information, progress and scheduling is constructed.

Description

technical field [0001] The invention relates to a mechanical and electrical engineering management system, in particular to a construction industry mechanical and electrical distribution line engineering construction and engineering management system. Background technique [0002] The following problems exist in the construction of electromechanical engineering nowadays: [0003] 1. Unplanned construction Because there is no planned analysis and confirmation of pre-construction engineering drawings and specifications during the implementation of design drawings, so each operator cannot understand the process execution and operation content. It is caused by errors. Lost man-hours. [0004] 2. Due to the improper command and dispatch of the management personnel of Party A and Party B, the failure to invest manpower in accordance with the priority of the project leads to the loss of working hours caused by repeated construction. [0005] 3. Uncertainty in manpower demand lead...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/0631G06Q10/103G06Q50/08
Inventor 吴智信
Owner 钜镒工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products