Water retention method of sand farmland
A technology for farmland and sandy land, applied in the field of water conservation in sandy land, can solve problems such as damage and low efficiency, and achieve the effect of promoting collection, avoiding leakage, and improving the effect of water and fertilizer retention.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0032] The present invention can be used in the sandy land of the chestnut cinnamon area with uniform profile in a single row and double plant hole planting corn, and its implementation mode is as follows:
[0033] Step 1: Positioning. After the harvest of corn in the previous year (at the end of September or the beginning of October), the 4 holes were drilled according to the size of the farmland plot, and the center of each hole was marked with a wooden stick or a straw. 40cm, row spacing is 50cm.
[0034] Step 2: Take the topsoil. Before drilling hole 4, shovel out the 10cm-deep topsoil within the 410cm range of the drilling hole and place it on a piece of plastic film. The range of shoveling out is about 20cm from the center of drilling hole 4.
[0035] Step 3: Drill Hole 4. Utilize the trolley ground drill to carry out drilling 4 according to the marked position, the diameter of drilling 4 is 20cm, and the depth of drilling 4 is 80cm.
[0036] Step 4: Make the outer n...
Embodiment 2
[0041] Step 1: Positioning. After harvesting the previous crops in the autumn of last year (at the end of September or early October), drill holes 4 for positioning according to the size of the farmland plot. Insert a wooden stick or straw into the center of each hole for marking. The hole spacing is 40cm and the row spacing is 60cm.
[0042] Step 2: Take the topsoil. Before drilling hole 4, shovel out the 10cm-deep topsoil within the 410cm range of the drilling hole and place it on a piece of plastic film. The range of shoveling out is about 20cm from the center of drilling hole 4.
[0043] Step 3: Drill Hole 4. Utilize the trolley ground drill to carry out drilling 4 according to the marked position, the diameter of drilling 4 is 20cm, and the depth of drilling 4 is 80cm.
[0044] Step 4: Make the outer non-woven bag of the anti-seepage bag 1 ( figure 2 ). Make a double-layer anti-seepage bag outer layer non-woven fabric bag 1 with a diameter of 20cm (corresponding to ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com