Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Power distribution network planning method and device considering differentiated reliability requirements

A distribution network planning and reliability technology, applied in the direction of electrical digital data processing, design optimization/simulation, CAD based on constraints, etc., can solve the problems of increasing construction investment costs, and achieve the effect of saving comprehensive costs and short distances

Pending Publication Date: 2021-05-07
RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +2
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above studies are all based on meeting the overall reliability needs of users to find the most economical distribution network planning scheme, but they have not fully explored and considered the differentiated reliability needs of different types of power users, resulting in the planning and construction of some lines. The optimal choice under the current conditions, which increases the construction investment cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution network planning method and device considering differentiated reliability requirements
  • Power distribution network planning method and device considering differentiated reliability requirements
  • Power distribution network planning method and device considering differentiated reliability requirements

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, but not all of them. Based on the embodiments in the present application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present application.

[0053] figure 1 is a flow chart of a distribution network planning method considering differentiated reliability requirements in this embodiment; figure 2 It is a flow chart of determining the routing of the trunk line through the ant colony algorithm in this embodiment; image 3 It is a schematic diagram of solving the routing of br...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a power distribution network planning method and device considering differentiated reliability requirements. The method comprises the following steps: presetting a budget minF of a distribution network wiring planning scheme; obtaining candidate main line wiring by using an ant colony algorithm, using a branch line combination solving method to obtain branch line wiring connecting the load point and the candidate trunk line wiring, and forming a power distribution network wiring planning scheme in a constraint condition range according to the overall wiring formed by the candidate main line wiring and the branch wiring; calculating the comprehensive cost F of the power distribution network wiring planning scheme by using a power distribution network frame planning cost model; simulating a power supply fault by using a sequential Monte Carlo simulation method to calculate the reliability of the power distribution network wiring planning scheme, judging whether the reliability meets a differentiated reliability constraint and an overall reliability constraint, and if not, performing elimination; comparing whether the comprehensive cost F is less than the minF, if so, determining that the minF is equal to the F, otherwise, abandoning; and judging whether the minF converges or not, and if so, outputting a target distribution network wiring planning scheme.

Description

technical field [0001] The present application relates to the field of distribution network planning, in particular to a method and device for distribution network planning considering differentiated reliability requirements. Background technique [0002] Distribution network planning often needs to consider the two major indicators of economy and reliability. However, in order to improve the reliability of distribution network planning, on the one hand, it is inevitable to strengthen the electrical connection of the power grid, which leads to an increase in construction costs and poor economic efficiency; on the other hand, reducing investment and construction costs often leads to Degradation of quality and reliability. Therefore, how to balance the relationship between the two is the focus of distribution network planning research. [0003] In the existing technology, there have been studies on the coordination of reliability and economy, such as "Distribution Network Pl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/18G06F30/20G06Q50/06G06F111/04G06F113/04G06F119/02
CPCG06F30/18G06F30/20G06Q50/06G06F2111/04G06F2113/04G06F2119/02
Inventor 冯亮鉴庆之李文升赵龙郑志杰吴奎华梁荣杨波杨扬刘蕊邓海珊綦陆杰崔灿冯旭杨慎全曹璞佳王耀雷李勃朱毅李昭赵韧刘钊刘淑莉张雯李凯邓少治王延朔李昊张博颐
Owner RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products