Construction method of plastic sleeve secant pile
A construction method and technology of plastic sleeves, applied in excavation, sheet pile walls, foundation structure engineering, etc., can solve the problems of poor quality of concrete occlusal parts, water leakage, high cost, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] refer to Figure 1-Figure 3 , a kind of construction method of plastic casing occlusal pile, it comprises the steps:
[0036] (1) Please refer to figure 1 In step a, the first pile hole is constructed at intervals, and the figure 1 3 exemplarily shows three first pile holes, and the three first pile holes are respectively the first pile hole A11, the first pile hole B12 and the first pile hole C13 in sequence.
[0037] (2) See figure 1 In step b, lower the first reinforcement cage 31 carrying the first plastic hollow tube 32 into the first pile hole, and the first plastic hollow tube 32 is fixed on the outside of the first reinforcement cage. Sand 33 is poured into the first plastic hollow tube 32 ; then concrete is poured into the first pile hole to form the first pile body 39 .
[0038] The bottom elevation of the first plastic hollow pipe is the same as the bottom elevation of the first reinforcement cage.
[0039] (3) Please continue to readfigure 1 In step b, ...
PUM
Property | Measurement | Unit |
---|---|---|
Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com