Construction quality safety risk management method, system and device and storage medium
A technology of safety risk and construction quality, applied in data processing applications, special data processing applications, instruments, etc., can solve construction quality safety accidents, uncertainty, casualties and economic losses, etc., to improve construction quality and reduce losses. , to achieve the effect of risk management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0068] A construction quality and safety risk management method, refer to figure 1 ,include:
[0069] 101. Obtain construction drawings, and simulate the construction scheme according to the construction drawings.
[0070] Specifically, the construction scheme simulation is a 4D simulation combined with the process animation generated by BIM technology. Among them, when obtaining the construction drawings, it is also necessary to obtain the construction process, construction site and construction tools of the target building.
[0071] According to the project BIM application standard, carry out three-dimensional modeling on the construction drawings, and obtain the project BIM model, which includes the target building, construction site, construction tools, etc.
[0072] Among them, the project BIM application standard refers to the application guidelines of BIM technology in the project, which is the project BIM application program, and all participating parties should unif...
Embodiment 2
[0117] A construction quality and safety risk management system, refer to figure 2 ,include:
[0118] The simulation device 201 acquires construction drawings, and simulates the construction scheme according to the construction drawings.
[0119] The monitoring device 202 monitors the construction process of the target building in real time, and acquires a video of the construction process.
[0120] The comparing means 203 compares the video and the simulation training result.
[0121] Further, converting the video into several frames of images;
[0122] Converting to a corresponding 3D model according to several frame images;
[0123] updating the 3D model in real time according to the video;
[0124] comparing the 3D model with the simulation training result.
[0125] The judging means 204, if inconsistent, identifies the inconsistent construction steps, and judges the risk level of the construction steps.
[0126] Further, when the 3D model is inconsistent with the s...
Embodiment 3
[0137] A construction quality and safety risk management device, refer to image 3 ,include:
[0138] The simulation device 301 acquires construction drawings, and simulates the construction scheme according to the construction drawings.
[0139] The monitoring device 302 monitors the construction process of the target building in real time, and obtains a video of the construction process.
[0140] The comparing means 303 compares the video and the simulation training result.
[0141] Further, converting the video into several frames of images;
[0142] Converting to a corresponding 3D model according to several frame images;
[0143] updating the 3D model in real time according to the video;
[0144] comparing the 3D model with the simulation training result.
[0145] The judging means 304, if inconsistent, identifies the inconsistent construction steps, and judges the risk level of the construction steps.
[0146] Further, when the 3D model is inconsistent with the sim...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com