Installation and construction method for prefabricated cabin of 110-kilovolt transformer substation

A construction method and technology of prefabricated cabins, applied in switchgear, electrical components, etc., can solve the problems of heavy workload, cumbersome construction details, long construction period, etc.

Pending Publication Date: 2021-02-12
国网河南省电力公司中牟县供电公司 +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The prefabricated cabin type substation is composed of a prefabricated cabin, a secondary equipment screen cabinet (or rack), a high-voltage cabinet, and cabin auxiliary facilities. The on-site primary equipment and secondary equipment are placed in the prefabricated cabin and battery prefabricated cabin. The main and secondary equipment prefabricated cabins are in two other warehouses; the primary equipment, secondary combined equipment, and batteries in the prefabricated cabins are all manufactured, assembled, wired, and debugged in the factory, and transported as a whole in the form of a box room to the project site; due to the large size of the prefabricated cabin, the prefabricated cabin needs to be hoisted to the prefabricated position by a truck crane for installation, and then the prefabricated cabin will be lowered to the prefabricated position through the command and cooperation of the on-site staff; Unified debugging is required, the overall construction workload is large, the construction period is long, and the construction details are cumbersome, and a little carelessness will bring indelible losses to the construction; so now a complete set of construction methods is urgently needed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Installation and construction method for prefabricated cabin of 110-kilovolt transformer substation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0072] Below in conjunction with accompanying drawing, the present invention will be further explained and illustrated:

[0073] see figure 1 , a substation prefabricated cabin installation construction method is characterized in that: comprising the following steps:

[0074] 2) Construction preparation

[0075] A. Prepare the tools for hoisting and check whether the prefabricated cabin is damaged;

[0076] B. Clear the obstacles on the site, and take safety measures such as anti-tilting and anti-collapse of the crane before hoisting

[0077] C. After the prefabricated cabin is in place, bend the grounding lead model, and cut the material according to the size of the model. When cutting the material, a margin should be left. During the bending process of the flat steel, mechanical cold bending should be used to avoid hot bending damage to the cast layer; after production The grounding lead wire of the prefabricated cabin is bolted and fastened to the special grounding piece...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Yield strengthaaaaaaaaaa
Thicknessaaaaaaaaaa
Diameteraaaaaaaaaa
Login to View More

Abstract

The invention discloses an installation and construction method for a prefabricated cabin of a 110-kilovolt transformer substation. The installation and construction method specifically comprises thefollowing steps of equipment unpacking; equipment basic inspection; obstacle removal; equipment hoisting and installation; equipment adjustment, fastening and inspection; accessory installation; grounding installation; and electrical wiring installation. With the installation and construction method for a prefabricated cabin of a 110-kilovolt transformer substation adopted, the situation that collision damage occurs when the prefabricated cabin is hoisted is avoided, a set of complete operation process and operation procedures are provided, the construction quality is improved, the construction period is shortened, the overall stability and safety of construction are guaranteed. The installation and construction method is easy to popularize.

Description

Technical field: [0001] The invention is applicable to the installation and construction of a prefabricated cabin in a 110-kilovolt substation project, in particular to a method for installing and constructing a prefabricated cabin in a 110-kilovolt substation, and belongs to the technical field of electric power construction. Background technique: [0002] The prefabricated cabin type substation is composed of a prefabricated cabin, a secondary equipment screen cabinet (or rack), a high-voltage cabinet, and cabin auxiliary facilities. The on-site primary equipment and secondary equipment are placed in the prefabricated cabin and battery prefabricated cabin. The main and secondary equipment prefabricated cabins are in two other warehouses; the primary equipment, secondary combined equipment, and batteries in the prefabricated cabins are all manufactured, assembled, wired, and debugged in the factory, and transported as a whole in the form of a box room to the project site; d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02B3/00
CPCH02B3/00
Inventor 杨燕韩松毛中科安思王鹏张开帆杨瑞敏赛颖孙豪杰曹珂
Owner 国网河南省电力公司中牟县供电公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products