Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

BIM-based four-power construction group plan simulation and resource dynamic adjustment method and system

A dynamic adjustment and planning technology, applied in resources, calculations, instruments, etc., can solve the problems of inability to evaluate the influence degree of key line construction period by other processes and early warning, low efficiency, inaccurate results, etc.

Pending Publication Date: 2021-02-12
INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI +2
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, there are still many problems in the traditional construction organization management mode. For example, the current construction organization design management mainly uses dispatch reports to count construction progress data. The results of manual analysis are inaccurate and inefficient, and it is impossible to evaluate the construction period of key lines. Affected by other processes and early warning, and thus unable to allocate resources to the project management in a timely manner
At the same time, in the implementation process of construction organization, the focus is on the pursuit of construction benefits and little consideration is given to economic benefits and other issues.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based four-power construction group plan simulation and resource dynamic adjustment method and system
  • BIM-based four-power construction group plan simulation and resource dynamic adjustment method and system
  • BIM-based four-power construction group plan simulation and resource dynamic adjustment method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be described in further detail below in conjunction with the embodiments and accompanying drawings. Here, the exemplary embodiments and descriptions of the present invention are used to explain the present invention, but not to limit the present invention.

[0040]Here, it should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only the structures and / or processing steps closely related to the solution according to the present invention are shown in the drawings, and the related Other details are not relevant to the invention.

[0041] It should be emphasized that the term "comprising / comprising" when used herein refers to the presence of a feature, element, step or component, but does not exclude the presence or addition of one or more other features, elements, steps or components.

[0042] An embo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM-based four-power construction group plan simulation and resource dynamic adjustment method and system, and the method comprises the steps: calling a WBS process decomposition tree, obtaining the basic information of a process based on WBS, and obtaining a reference construction period; associating sub-nodes in the WBS with sub-nodes in a BBS entity, and calling a design amount; calculating a product of the design amount and a reference construction period to obtain a process construction period; based on the project amount, the total project amount percentage and the construction period, obtaining a planned completion project amount Gantt chart, and inputting the receiving progress information into the planned completion Gantt chart to obtain a comparison chart; inputting the plan engineering information into the BIM model to obtain a plan completion engineering quantity progress chart under the process and construction period dimensions, receiving progressinformation, obtaining a plan and actual completion engineering quantity comparison chart under the process and construction period dimensions, and receiving an actual and plan completion comparisonGantt chart; and judging whether the actual progress lags behind or not, and if so, adjusting the engineering plan. By means of the scheme, online engineering compilation and real-time adjustment canbe achieved.

Description

technical field [0001] The present invention relates to the field of railway engineering informatization, in particular to a BIM-based method and system for planning simulation and resource dynamic adjustment of four power construction groups. Background technique [0002] With the rapid development of high-speed railways and intercity railways, railway construction has made remarkable achievements. However, there are still many problems in the traditional construction organization management mode. For example, the current construction organization design management mainly uses dispatch reports to count construction progress data. The results of manual analysis are inaccurate and inefficient, and it is impossible to evaluate the construction period of key lines. Due to the impact of other processes and early warning, it is impossible to allocate resources to the project management party in a timely manner. At the same time, in the implementation process of construction orga...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08G06Q50/26
CPCG06Q10/06312G06Q50/08G06Q50/26
Inventor 王同军王万齐刘红良王燕解亚龙卢文龙刘延宏王江索宁石新桥王佳琦王键梁策李达塽刘红峰鲍榴贺晓玲刘伟尹逊霄杨威陈雪娇郭晓翠郭芳邵磐李栋梁陈杰张敬涵郭鹏飞李祯怡乔方博江若飞范志强黄万朋钟宜顺钱进刘北胜李慧郝蕊王荣波史瑞昌秦琳王可飞王坤乔立贤刘学兵白龙彪杨兴磊鲁玉龙
Owner INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products