Water conservancy design construction management method and system for EPC general contract project

A construction management and design system technology, applied in the direction of calculation, geometric CAD, data processing applications, etc., can solve problems such as unfavorable construction direction and time node, unfavorable real-time monitoring and viewing, unfavorable project cost, etc., so as to omit construction detail management and improve Efficiency and accuracy, reducing the effect of contracting

Pending Publication Date: 2020-12-29
中建三局水利水电开发有限公司
View PDF11 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in the current water conservancy construction process, most of the construction teams are directly invited to bid for construction, which is not conducive to the overall control of project costs, and it is necessary to check and accept multiple projects in the construction process, which not only greatly reduces construction efficiency, but also It is not conducive to the overall control of the construction direction and time nodes, further increasing the construction cost, and for each node in the construction process, it is not conducive to real-time monitoring and viewing, affecting management efficiency. Therefore, a construction management method using contracted projects needs to be proposed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Water conservancy design construction management method and system for EPC general contract project
  • Water conservancy design construction management method and system for EPC general contract project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0033]A water conservancy design and construction management method and system for EPC general contracting projects, including project system 1, project system 1 is connected with design system 2, design system 2 is connected with construction system 3, and construction system 3 is connected with operation system 4. The construction system 3 is auxiliary connected with the construction management system 5.

[0034]The method includes the following steps:

[0035]S1. Establish a project system according to development and needs, and conduct project search and assessment;

[0036]S2. Research the expectations of the project and form a project plan;

[0037]S3. Conduct bidding negotiations according to the project plan and sign the contract for the project;

[0038]S4. Form a design system and carry out project design according to the plan and project contract;

[0039]S5. Establish a construction system according to the project design, carry out equipment procurement and installation construction;

[0040...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a water conservancy design construction management method and system for an EPC general contract project, and the system comprises a project system which is connected with a design system in an associated manner, the design system is connected with a construction system in an associated manner, the construction system is connected with an operation system in an associated manner, and the construction system is in auxiliary connection with a construction management system. Through the mutual management of a plurality of branch systems, the method can achieve the layeredmanagement and control of a plurality of types of change-over from project searching, assessment, construction and completion acceptance, effectively improves the flow efficiency, achieves the management in a mode of overall contract contract contract, can directly control the construction quality, saves the construction detail management, effectively reduces the contract. Meanwhile, digital management is established in construction, checking and filing can be implemented, analysis and management in the acceptance stage are facilitated, omission is avoided, in this way, the efficiency and accuracy of contract management can be greatly improved, the construction cost is effectively reduced, and the construction quality is guaranteed.

Description

Technical field[0001]The invention relates to the technical field of water conservancy construction, in particular to a water conservancy design and construction management method and system for EPC general contracting projects.Background technique[0002]In the current social life, various siege construction projects are becoming more and more numerous, especially water conservancy construction, which has stricter engineering requirements.[0003]However, in the current water conservancy construction process, most of the engineering teams are directly bidding for construction and construction. This is not conducive to the overall control of the project cost, and it is necessary to check and accept multiple projects in the construction process in blocks, which not only greatly reduces the construction efficiency, but also It is not conducive to the overall control of the construction direction and time nodes, which further increases the construction cost, and for each node in the constr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06F30/13
CPCG06Q10/103G06F30/13
Inventor 李路华刘铭馨孙秀燕李振海马强郑科学
Owner 中建三局水利水电开发有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products