Reservoir ecological scheduling method based on coupling modeling-optimization-optimization
A scheduling method and technology for optimizing scheduling, applied in instrumentation, data processing applications, forecasting, etc., can solve problems such as lack of research, insufficient theoretical basis for scheduling target selection, and positive correlation between targets.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0093] Attached below figure 1 -5. A specific embodiment of the present invention is described in detail, but it should be understood that the protection scope of the present invention is not limited by the specific embodiment.
[0094] Reservoir optimal dispatching is to seek the optimal water discharge scheme under the condition of known reservoir dispatching objectives and corresponding constraints. That is, according to the tasks undertaken by the reservoir, the dispatching target is extracted through analysis. Quantitative mathematical description of each target. On this basis, the reservoir dispatching model is constructed with the reservoir water level, time-period output, and water balance as model constraints. By using the multi-objective optimization algorithm to solve the model, the optimal water discharge scheme of the reservoir is obtained. The present invention mainly aims at the scientific problems that there is still room for further research in the optimiza...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com