A method for laying steel frames in the middle wall of multi-arch tunnels

A technology for multi-arch tunnels and steel frames, which is applied in tunnels, tunnel linings, mining equipment, etc., and can solve problems such as failure of multi-arch tunnel construction to meet safety requirements, disconnection between on-site construction process and design, and complex construction methods of multi-arch tunnels. , to achieve the effect of ensuring safe operation, reasonable stress, and solving tunnel cracking

Active Publication Date: 2022-06-14
GUIZHOU UNIV
View PDF12 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the construction method of multi-arch tunnels is more complicated than that of separate tunnels, and its domestic construction level is far behind that of foreign countries. Repeatedly disconnected, even though the multi-arch tunnel was completed through the efforts of the construction workers, cracks appeared soon after the tunnel was put into operation, making the construction of the multi-arch tunnel always fail to meet the safety requirements
In the actual construction of multi-arch tunnels, the way that the steel arch frame of the rear tunnel is overlapped with the steel arch frame of the preceding tunnel is often used for support, which is equivalent to acting on the steel arch frame of the preceding tunnel in a concentrated force. However, for As far as the tunnel structure is concerned, it is best to act on the structure in the form of uniform force, otherwise it will be extremely detrimental to the stability of the tunnel structure

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for laying steel frames in the middle wall of multi-arch tunnels
  • A method for laying steel frames in the middle wall of multi-arch tunnels
  • A method for laying steel frames in the middle wall of multi-arch tunnels

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0039] A method for laying a steel frame in the middle wall of a multi-arch tunnel. The double holes of the multi-arch tunnel are respectively provided with independent steel arch structures. Pre-embed the lower steel frame on the side of the rear hole close to the shared side wall into the shared side wall of the first hole. When the rear hole is excavated, the pre-buried lower steel frame and the steel frame of other parts of the rear hole steel arch structure shall be pre-buried. Fixed, thus forming a complete back row hole steel arch structure.

[0040] The steel arch structure includes an upper steel frame, a middle steel frame, a lower steel frame and an inverted arch steel frame. The steel frame is processed and formed according to the design requirements outside the hole, and the installation in the hole is carried out after the initial shotcrete. In order to ensure the overall stability and effectiveness of the steel frame, the steel frame is connected with the positi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for laying steel frames in the middle wall of a multi-arch tunnel. Independent steel arch structures are arranged in the double holes of the multi-arch tunnel, and the steel arch structures of the leading hole and the rear hole are staggered. In the process, the lower steel frame on the side close to the common side wall of the rear tunnel is pre-embedded in the common side wall of the first tunnel, and when the rear tunnel is excavated, the pre-embedded lower steel frame and other parts of the rear tunnel steel arch The steel frame is fixed to form a complete steel arch structure of the rear tunnel. This method changes the traditional overlapping method of the steel arch frame of the tunnel with multiple arches and no middle partition wall, and uses the misplaced layout of the steel arch frame to change the form of concentrated stress generated by the lap joint of the traditional steel arch frame, so that the force of the tunnel structure is more reasonable. , making the tunnel construction safer and ensuring the safe operation of the tunnel later.

Description

technical field [0001] The invention relates to a method for laying a steel frame of a middle wall of a multi-arch tunnel, and belongs to the technical field of tunnel support. Background technique [0002] With the rapid growth of my country's economy and the continuous increase of population, the process of infrastructure transportation construction is also accelerating. The main types of highway tunnels are split tunnels and multi-arch tunnels. Multi-arch tunnels can adapt to more terrains, have high space utilization, low construction costs, and can effectively solve bridge-tunnel connections and short tunnels in the process of highway construction. Therefore, in the process of expressway construction, the construction of multi-arch tunnels has significant advantages over split tunnels. [0003] However, the construction method of the multi-arch tunnel is more complicated than that of the split tunnel, and its construction level in China is far from that of foreign coun...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/18E21D11/10G06F30/20G06F119/14
CPCE21D11/18E21D11/10G06F30/20G06F2119/14
Inventor 熊鹏饶军应
Owner GUIZHOU UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products