High-strength mining rock stratum migration grouting control and grouting amount calculation method

A grouting volume, high-strength technology, applied in ground mining, mining equipment, earthwork drilling and mining, etc., can solve the problems of large damage range of overlying strata, high degree of surface ecological damage, and large mining face size

Active Publication Date: 2020-12-18
CHINA UNIV OF MINING & TECH (BEIJING)
View PDF4 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the rapid advancement of high-intensity mining, the large size of the mining face, the large damage range of the overlying strata, the rapid surface subsidence and large deformation, the high degree of damage to the surface and ecology, and the prominent contradiction between resource development and ecological mining area construction, etc., it is very difficult. It is difficult to control the degree of surface damage from the source

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-strength mining rock stratum migration grouting control and grouting amount calculation method
  • High-strength mining rock stratum migration grouting control and grouting amount calculation method
  • High-strength mining rock stratum migration grouting control and grouting amount calculation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] An implementation of the present invention will be further described below in conjunction with accompanying drawing:

[0022] a. Calculate the position of the key layer 1 according to the drilling column diagram of the overlying rock, and calculate the height H1 of the caving zone 6 and the height H of the fracture zone 9 according to the mining height M of the coal seam 8 and the lithology of the roof 2 , the buried depth of coal seam 8 is H.

[0023] b. When H 2 When >H, the overlying rock is a "two-zone" development structure ( figure 1 ), it is necessary to carry out grouting in the caving zone 6;

[0024] c. When H 2 When figure 2 ), there is no need to carry out grouting for the caving zone 6;

[0025] d. Drill the ground borehole 4 from the ground surface 10 to the caving zone 6, and the position of the ground drilling 4 in the caving zone 6 is directly above the middle part of the cutting hole 5 in the working face;

[0026] e. When the working face 7 adva...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a shallow-buried high-strength mining rock stratum migration grouting control and grouting amount calculation method, and belongs to a coal mine high-strength mining damage control and surface damage reduction method. Aiming at a shallow-buried high-strength overlying strata large-damage two-zone development structure of a western mining area, the invention provides a low-damage three-zone overlying strata structure formed by grouting and filling a caving zone and a bed-separated fissure zone, so that the surface damage is greatly reduced. The shallow-buried high-strength mining rock stratum migration grouting control and grouting amount calculation method mainly comprises the steps of determining the position of an overlying strata key layer; calculating maximum deflection w of the key layer before breaking; calculating a grouting amount calculation formula Vg=piwLd / 3 required by the bed-separated fissure zone, and determining the height H1 of the caving zone according to the mining height of the coal seam working face and the properties of a roof and a floor; and further giving a calculation formula Vk = dH1L-Vg-(H1-M)bdL of the grouting amount of the caving zone for ensuring that the key layer is not broken; according to a calculation result, after a lower main roof of the working face is fractured for the first time, drilling a well from the ground and grouting into the caving zone; and when the working face is pushed to one square, beginning to grout the bed-separated fracture body. The shallow-buried high-strength mining rock stratum migration grouting control and grouting amount calculation method is as shown in the drawing of the abstract. By implementing the shallow-buried high-strength mining rock stratum migration grouting control and grouting amount calculation method, the surface damage degree of shallow-buried high-strength mining can be greatly reduced, and green mining of ecologically fragile regions of western mining areas isrealized.

Description

technical field [0001] The invention relates to a high-strength mining damage reduction method for shallow buried coal seams, in particular to a mining damage control method based on grouting to control rock layer migration. Background technique [0002] With the advancement of technology and equipment, the scale of underground coal mines in my country has grown from a million-ton level (1-3 million tons / year) in the 1990s to a tens-million-ton level (10-30 million tons / year) at the beginning of this century. Years), the level of mining and coal mining has been continuously improved, and it has become an important way to improve the safety and security level of coal mines, the resource recovery rate and economic benefits. According to the layout of intensive development, the output of my country's 14 large coal bases accounts for more than 95% of the country's total. High-intensity mining is an important method of intensive mining, but it brings about rapid surface subsidenc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21C41/18E21F15/00
CPCE21C41/18E21F15/005
Inventor 张村赵毅鑫李全生任赵鹏刘金保滕腾王伟何祥吴山西贾胜胡林枫杨永松
Owner CHINA UNIV OF MINING & TECH (BEIJING)
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products