Drainage system waterlogging prevention emergency plan making method
A drainage system and emergency plan technology, applied in the direction of climate change adaptation, data processing applications, special data processing applications, etc., can solve problems such as waterlogging risk in rough drainage system flood control capabilities
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0166] Embodiment 1, constructing the drainage system mathematical model
[0167] The Zhaojiabang and Luban drainage systems are located in the central area of Xuhui District, Shanghai. Both are combined forced drainage systems. The service area of the Zhaojiabang system is about 7.38km 2 , the service area of Luban system is about 3.58km 2 , The current design of the system has a rainstorm return period of once a year, and the combined system overflow rainwater is pumped and discharged into the Huangpu River. Use the pipeline network geographic information system and high-definition aerial photos to obtain pipeline and land use property data. In this example, the Infoworks software platform is selected to build a drainage network model including the Zhaojiabang and Luban systems, and the actual measurement data is used for calibration verification to ensure the validity of the model. In specific applications, software with similar functions can be selected for model b...
Embodiment 2
[0169] Example 2, formulating an emergency plan for drainage system waterlogging prevention
[0170] 1) Analysis of meteorological rainstorm four-color early warning level
[0171] In this example, the corresponding meanings of the selected meteorological four-color warnings are shown in Table 3. The yellow, orange, and red rainstorm warnings in the meteorological warnings correspond to the 1-year, 2-year and 5-year short-duration design rainstorms in Shanghai. adapt.
[0172] Table 3 Meteorological four-color early warning comparison table
[0173]
[0174] 2) Analyze the discharge conditions of the intercepted sewage
[0175] The total scale of Zhaojiabang Pumping Station is 34.23m 3 / s, of which the flow rate of the rainwater distribution pump is 29.43m 3 / s(3.27m 3 / s*9 units), the flow rate of the sewage distribution pump is 4.8m 3 / s(1.2m 3 / s*4 units, equivalent to interception capacity 3.3mm / h). The total scale of Luban Pumping Station is 31m 3 / s, where th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com