Community energy internet energy transaction scheduling method and system considering wind power consumption
An energy internet and wind power consumption technology, applied in the power grid field, can solve problems such as difficulty in adapting to the trend of clean energy and the rapid development of power grids, adverse effects of normal operation of the distribution network, system instability, etc., to reduce real-time control costs, promote Good development and the effect of relieving operating pressure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] The community energy Internet energy transaction scheduling method considering wind power consumption, such as Figure 12 shown, including:
[0064] S1. Considering the maximum consumption of wind power and the uncertainty of wind power output, and based on the principle of minimum operation cost and power interaction cost of community energy internet, formulate a robust economic dispatch strategy for community energy internet;
[0065] S2. According to the bidding strategy proposed by the robust economic scheduling strategy, each community energy Internet formulates the bidding electricity price and bidding electricity according to the non-cooperative game;
[0066] S3. According to the robust economic scheduling strategy of the Community Energy Internet and the proposed bidding strategy and scheduling request, the information center dispatches the electric energy of each community Energy Internet and distribution network to meet the load demand of each community; The...
Embodiment 2
[0160] The difference between this embodiment and Embodiment 1 is that in this embodiment, three community energy internets are used as a cluster for research, considering the differences in the specific conditions of the energy internet parameters of each community, assuming the following data as the energy parameters of each community for simulation, wherein, The controllable unit parameters of each community energy Internet are shown in Table 1; the EES operating parameters are shown in Table 2; the maximum interactive power between each community energy Internet and between each community energy Internet and the grid is taken as 300kW.
[0161] Table 1 Community Energy Internet 1-3 Controllable Unit Operating Parameters
[0162]
[0163] Table 2 Community Energy Internet 1-3 Energy Storage Unit Parameters
[0164]
[0165] In this embodiment, the community energy internet cluster system structure is as follows: figure 1 As shown, it includes distribution network, in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com